7/7/26, 9:09 AM Fdny p-99 c of f Exam Comprehensive Questions and Answers (Verified Answers) Updated (Actual Exam) 2025\2026 LATEST VERS…
Fdny p-99 c of f Exam Comprehensive Questions
and Answers (Verified Answers) Updated (Actual
Exam) 2025\2026 LATEST VERSION!!
Save Add to calendar
Terms in this set (87)
What is a general requirement of the Adequate clearance from combustile construction
location of the installation of a
boiler?
What temperature must the materials 170 degrees
remain under during combustion?
What is a requirement for the access Access for operation and maintenance must not be
of the boiler? hazardous
https://quizlet.com/1193534333/fdny-p-99-c-of-f-exam-comprehensive-questions-and-answers-verified-answers-updated-actual-exam-20252026-latest… 1/9
, 7/7/26, 9:09 AM Fdny p-99 c of f Exam Comprehensive Questions and Answers (Verified Answers) Updated (Actual Exam) 2025\2026 LATEST VERS…
What is required upon installation to Inspection and test resulting in equipment use
operate a boiler? permit from commissioner
How often should a boiler be Once a year
inspected?
What documentation is required Owners annual statement
from a certificate holder?
What is required to hydrostatically Liquid fuel piping and fuel oil storage tanks by the
test upon installation and who installing contractor
should perform these tests?
At what pressure should piping be 1/2 max working pressure but less than pressure
tested? required for storage tank
At what pressure should oil storage At 1 1/2x max working pressure but never < 25 psi
tanks be tested?
How long should hydrostatic Until all joints and connections are inspected for
pressure be maintained? leaks and at 30 minutes have passed
Who is responsible for testing gas Installing contractor before closing and operation
distribution piping?
What is described on instruction Care and operation of oil burner located near the
cards and where are they located? equipment.
https://quizlet.com/1193534333/fdny-p-99-c-of-f-exam-comprehensive-questions-and-answers-verified-answers-updated-actual-exam-20252026-latest… 2/9
Fdny p-99 c of f Exam Comprehensive Questions
and Answers (Verified Answers) Updated (Actual
Exam) 2025\2026 LATEST VERSION!!
Save Add to calendar
Terms in this set (87)
What is a general requirement of the Adequate clearance from combustile construction
location of the installation of a
boiler?
What temperature must the materials 170 degrees
remain under during combustion?
What is a requirement for the access Access for operation and maintenance must not be
of the boiler? hazardous
https://quizlet.com/1193534333/fdny-p-99-c-of-f-exam-comprehensive-questions-and-answers-verified-answers-updated-actual-exam-20252026-latest… 1/9
, 7/7/26, 9:09 AM Fdny p-99 c of f Exam Comprehensive Questions and Answers (Verified Answers) Updated (Actual Exam) 2025\2026 LATEST VERS…
What is required upon installation to Inspection and test resulting in equipment use
operate a boiler? permit from commissioner
How often should a boiler be Once a year
inspected?
What documentation is required Owners annual statement
from a certificate holder?
What is required to hydrostatically Liquid fuel piping and fuel oil storage tanks by the
test upon installation and who installing contractor
should perform these tests?
At what pressure should piping be 1/2 max working pressure but less than pressure
tested? required for storage tank
At what pressure should oil storage At 1 1/2x max working pressure but never < 25 psi
tanks be tested?
How long should hydrostatic Until all joints and connections are inspected for
pressure be maintained? leaks and at 30 minutes have passed
Who is responsible for testing gas Installing contractor before closing and operation
distribution piping?
What is described on instruction Care and operation of oil burner located near the
cards and where are they located? equipment.
https://quizlet.com/1193534333/fdny-p-99-c-of-f-exam-comprehensive-questions-and-answers-verified-answers-updated-actual-exam-20252026-latest… 2/9