1. What is the primary goal of a decommissioning safety specialist during
b b b b b b b b b b b b
a nuclear facility shutdown?
b b b
A) Increase production efficiency b b
B) Install new equipment b b
C) Ensure worker and environmental safety
b b b b
D) Reduce operational costs b b
The main goal during decommissioning is to protect workers and the envi
b b b b b b b b b b b
ronment from hazards. b b
2. Which of the following best describes ALARA in radiation protection?
b b b b b b b b b
A) As Low As Reasonably Achievable
b b b b
B) As Long As Radiation Allows
b b b b
, C) Average Level Against Radiation Activity
b b b b
D) As Late As Radiation Accepts
b b b b
ALARA is a radiation safety principle to minimize exposure.
b b b b b b b b
3. During decommissioning, what is the primary method to control
b b b b b b b b b
airborne contamination? b
A) Use of handheld radiation detectors
b b b b
B) Administrative controls b
C) Remote monitoring systems b b
D) Engineering controls such as HEPA filtration and containment
b b b b b b b b
Engineering controls physically prevent contaminants from sprea
b b b b b b
ding.
4. What type of personal protective equipment (PPE) is essential when
b b b b b b b b b b
handling radioactive waste?
b b
A) Safety boots only b b
B) Respirators, gloves, and protective suits b b b b
C) Hard hats and safety goggles only
b b b b b
D) Hearing protection b
Respirators and protective suits prevent inhalation or skin contact wi
b b b b b b b b b
th radioactive material.
b b
5. What document must be reviewed to understand site-
b b b b b b b
specific hazards before decommissioning?
b b b
A) Safety meeting minutes
b b
B) Equipment manuals b
, C) Training logs b
D) Site Safety Analysis Report (SAR)
b b b b
SAR details hazards, controls, and procedures specific to the site.
b b b b b b b b b
6. Which regulation governs the safe transportation of radioactive
b b b b b b b b
materials during decommissioning? b b
A) OSHA 1910 b
B) EPA Clean Air Act b b b
C) 49 CFR (Department of Transportation regulations)
b b b b b
D) NRC Part 20 b b
49 CFR covers transportation safety standards for hazardous material
b b b b b b b b
s.
7. In the event of an unplanned radiation release, what is the first p
b b b b b b b b b b b b
riority?
A) Continue work to assess damage b b b b
B) Notify the media b b
C) Document the event in a report b b b b b
D) Evacuate personnel and isolate the area b b b b b
Safety of personnel is the top priority to prevent exposure.
b b b b b b b b b
8. When removing contaminated equipment, what is an essential step?
b b b b b b b b
A) Painting the equipment for identification
b b b b
B) Disassembling equipment immediately b b
C) Surveying and labeling contamination levels b b b b