Question:
With whom should the interior designer consult to determine where to locate the standing stacks in
a library? A. mech engineer B. library planner C. structural engineer D. fire protection designer
Answer:
C. The structural engineer
Question:
In specifying new window coverings and tracks to replace building standard window coverings,
what coordination is MOST important for the ID to undertake? (choose 4 that apply) A. Verify the
building owner approves of the change in the building's exterior appearance B. Asking the
electrical engineer if the new light reflectance is detrimental C. Determine if the mech. engineer
objects to the replacement plans D. getting approval from the client concerning the color of the
coverings E. verifying with the manuf. that flammability does not pose a problem F. checking with
the architect that the new coverings do not adversely effect the heating of the glass
Answer:
A. Verify the building owner approves of the change in the building's exterior appearance
Question:
C. Determine if the mech. engineer objects to the replacement plans E. Verifying with the manuf.
that flammability does not pose a problem F. checking with the architect that the new coverings do
not adversely effect the heating of the glass In designing a new space, the ID can influence life
safety MOST by coordinating with the consultant concerning what?
Answer:
Sprinklers
Question:
Who is responsible for showing the telephone and data conduit runs on the drawings for a
commercial design project?
Answer:
Electrical Engineer
,Question:
Who would be responsible for ordering and placing a stone top of a custom built reception desk
that includes woodwork, stone, metal and a light fixture?
Answer:
Woodwork fabricator
Question:
Who is responsible for verifying that a recessed downlight does not interfere with the ductwork
shown on the mechanical plans?
Answer:
The interior designer
Question:
The final responsibility of awarding a contract rests with the..
Answer:
owner
Question:
An interior designer has written furniture specs for a project and has put the job out for bid to
several dealerships. In this situation, purchase orders are MOST likely to be written by the...
Answer:
Dealership.
Question:
Who is responsible for determining the location and general conditions of existing light fixtures as
part of a due diligence investigation?
Answer:
The Interior Designer.
Question:
Which type of chart is MOST often used with complex projects to show critical tasks and their
associated times?
Answer:
, CPM chart
Question:
One of the primary advantages of a full wall schedule is that it..
Answer:
involves the ENTIRE PROJECT TEAM in the scheduling!
Question:
The interior designer is responsible for which of the following aspects of consultant coordination ?
Answer:
A. Giving the electrical engineer information about the client's equipment
Question:
B. Providing the mechanical engineer with the occupant load for each space D. Making sure the
final drawings and specifications are coordinated F. Giving the elec. engineer the designers
preferred choices for luminaires When coordinating with a security consultant, the ID's drawing
should show
Answer:
The positioning of the required lighting.
Question:
Thermostat locations are determined by the ...
Answer:
The mechanical engineer.
Question:
In which of the following building types are fire-resistive construction requirements likely to be
greatest?
Answer:
Type 1,
Type II-A,
Type II-B
Graded A+
Question:
With whom should the interior designer consult to determine where to locate the standing stacks in
a library? A. mech engineer B. library planner C. structural engineer D. fire protection designer
Answer:
C. The structural engineer
Question:
In specifying new window coverings and tracks to replace building standard window coverings,
what coordination is MOST important for the ID to undertake? (choose 4 that apply) A. Verify the
building owner approves of the change in the building's exterior appearance B. Asking the
electrical engineer if the new light reflectance is detrimental C. Determine if the mech. engineer
objects to the replacement plans D. getting approval from the client concerning the color of the
coverings E. verifying with the manuf. that flammability does not pose a problem F. checking with
the architect that the new coverings do not adversely effect the heating of the glass
Answer:
A. Verify the building owner approves of the change in the building's exterior appearance
Question:
C. Determine if the mech. engineer objects to the replacement plans E. Verifying with the manuf.
that flammability does not pose a problem F. checking with the architect that the new coverings do
not adversely effect the heating of the glass In designing a new space, the ID can influence life
safety MOST by coordinating with the consultant concerning what?
Answer:
Sprinklers
Question:
Who is responsible for showing the telephone and data conduit runs on the drawings for a
commercial design project?
Answer:
Electrical Engineer
,Question:
Who would be responsible for ordering and placing a stone top of a custom built reception desk
that includes woodwork, stone, metal and a light fixture?
Answer:
Woodwork fabricator
Question:
Who is responsible for verifying that a recessed downlight does not interfere with the ductwork
shown on the mechanical plans?
Answer:
The interior designer
Question:
The final responsibility of awarding a contract rests with the..
Answer:
owner
Question:
An interior designer has written furniture specs for a project and has put the job out for bid to
several dealerships. In this situation, purchase orders are MOST likely to be written by the...
Answer:
Dealership.
Question:
Who is responsible for determining the location and general conditions of existing light fixtures as
part of a due diligence investigation?
Answer:
The Interior Designer.
Question:
Which type of chart is MOST often used with complex projects to show critical tasks and their
associated times?
Answer:
, CPM chart
Question:
One of the primary advantages of a full wall schedule is that it..
Answer:
involves the ENTIRE PROJECT TEAM in the scheduling!
Question:
The interior designer is responsible for which of the following aspects of consultant coordination ?
Answer:
A. Giving the electrical engineer information about the client's equipment
Question:
B. Providing the mechanical engineer with the occupant load for each space D. Making sure the
final drawings and specifications are coordinated F. Giving the elec. engineer the designers
preferred choices for luminaires When coordinating with a security consultant, the ID's drawing
should show
Answer:
The positioning of the required lighting.
Question:
Thermostat locations are determined by the ...
Answer:
The mechanical engineer.
Question:
In which of the following building types are fire-resistive construction requirements likely to be
greatest?
Answer:
Type 1,
Type II-A,
Type II-B