CTS Exam Prep Questions and Answers with
Verified Solutions | Latest Updated 2026
What are the four teams that Owner, Design, Installation, and
comprise the overall Project Management
Team?
Who would belong to the Design Anyone with Consultant in their title except
team? the
moving consultant
Which groups make up the Developer, Construction Manager, and
Management Team? Building
Management Agency
The End-User, Facility Manager Owner
and
Building Committee comprise
which
team within the Project Team?
Which group represent the generic Project Managers, Designers and
roles that are important to the Installers
Project process?
Which project characteristics must Schedule, Size, Type, Complexity, and
be considered in order to Procurement
determine Requirements
which method is best suited for a
particular project?
,What is an important aspect of Technical Support Funding
funding that has a direct impact on
the project process and
design/installation?
Whether a construction project is Programming, Building Design, AV Bid,
large or small, which milestones and Move-
must In
be achieved in a typical schedule?
What type of project is a typical Long term projects with extended project
Consultant-Led Design-Bid-Build cycles
contract structure good for?
What is the risk in using an System and infrastructure design and
OFE/Integrator Installed contract facility
structure? functionality may suffer
What are some of the important Financial Stability, Current Workload, and
project scope and size Company
considerations in selecting an AV Credentials
provider?
What type of document typically RFQ
includes Project Size
Requirements,
Corporate Profile, Team
Personnel,
and Warranty Response Time?
, a significant difference between Negotiate with the highest ranking firm to
the finalize
Two-Envelope Bid the contract
Method and the Qualifications-
Based Selection Method?
What is one of the disadvantages More layers of responsibility and
of communication
contracting the AV integrator to the
electrical
subcontractor?
When conducting a complete Pre-Bid Meeting
project bid process, what
milestone
follows the issuing of the RFP?
Under what circumstances would Scoring responses to an RFQ
you likely use an A305-1986 form?
What is the ideal way to contract Directly to the Owner
an
AV integrator?
The process of identifying the Needs Analysis
activities that end-users need to
perform, and developing the
functional descriptions of your
systems is referred to as:?
Verified Solutions | Latest Updated 2026
What are the four teams that Owner, Design, Installation, and
comprise the overall Project Management
Team?
Who would belong to the Design Anyone with Consultant in their title except
team? the
moving consultant
Which groups make up the Developer, Construction Manager, and
Management Team? Building
Management Agency
The End-User, Facility Manager Owner
and
Building Committee comprise
which
team within the Project Team?
Which group represent the generic Project Managers, Designers and
roles that are important to the Installers
Project process?
Which project characteristics must Schedule, Size, Type, Complexity, and
be considered in order to Procurement
determine Requirements
which method is best suited for a
particular project?
,What is an important aspect of Technical Support Funding
funding that has a direct impact on
the project process and
design/installation?
Whether a construction project is Programming, Building Design, AV Bid,
large or small, which milestones and Move-
must In
be achieved in a typical schedule?
What type of project is a typical Long term projects with extended project
Consultant-Led Design-Bid-Build cycles
contract structure good for?
What is the risk in using an System and infrastructure design and
OFE/Integrator Installed contract facility
structure? functionality may suffer
What are some of the important Financial Stability, Current Workload, and
project scope and size Company
considerations in selecting an AV Credentials
provider?
What type of document typically RFQ
includes Project Size
Requirements,
Corporate Profile, Team
Personnel,
and Warranty Response Time?
, a significant difference between Negotiate with the highest ranking firm to
the finalize
Two-Envelope Bid the contract
Method and the Qualifications-
Based Selection Method?
What is one of the disadvantages More layers of responsibility and
of communication
contracting the AV integrator to the
electrical
subcontractor?
When conducting a complete Pre-Bid Meeting
project bid process, what
milestone
follows the issuing of the RFP?
Under what circumstances would Scoring responses to an RFQ
you likely use an A305-1986 form?
What is the ideal way to contract Directly to the Owner
an
AV integrator?
The process of identifying the Needs Analysis
activities that end-users need to
perform, and developing the
functional descriptions of your
systems is referred to as:?