1. A project manager is reviewing contract documents before mobilization.
Which document legally defines the scope of work?
A. Project schedule
B. Construction drawings
C. Specifications manual
D. Contract agreement
✔ Correct Answer: D. Contract agreement
Explanation: The contract agreement is the legally binding document that
defines scope, responsibilities, and obligations between parties.
2. A builder notices discrepancies between drawings and specifications. What
is the most appropriate action?
A. Proceed based on drawings
B. Proceed based on specifications
C. Request clarification via RFI
D. Ignore and continue work
✔ Correct Answer: C. Request clarification via RFI
Explanation: Submitting a Request for Information ensures discrepancies
are formally clarified before proceeding.
,3. Which soil type has the lowest load-bearing capacity?
A. Gravel
B. Sand
C. Clay
D. Bedrock
✔ Correct Answer: C. Clay
Explanation: Clay soils expand and shrink with moisture, reducing stability
and load-bearing capacity.
4. What is the primary purpose of a building permit?
A. Increase project cost
B. Ensure code compliance
C. Speed construction
D. Guarantee profit
✔ Correct Answer: B. Ensure code compliance
Explanation: Permits verify that construction meets safety and regulatory
standards.
5. In critical path method (CPM), what determines project duration?
A. Shortest path
B. Longest sequence of dependent tasks
C. Number of workers
D. Budget size
✔ Correct Answer: B. Longest sequence of dependent tasks
Explanation: The critical path defines the minimum time required to
complete the project.
6. A contractor must ensure worker safety at heights above 6 feet. What is
required?
A. Warning signs only
B. Safety harness or guardrails
C. Verbal instruction
D. Increased supervision
, ✔ Correct Answer: B. Safety harness or guardrails
Explanation: OSHA requires fall protection systems at heights above 6 feet.
7. Which contract type transfers most risk to the contractor?
A. Cost-plus
B. Time and materials
C. Lump sum
D. Unit price
✔ Correct Answer: C. Lump sum
Explanation: Lump sum contracts fix price, placing cost overrun risk on the
contractor.
8. What is the function of rebar in concrete?
A. Improve color
B. Reduce weight
C. Increase tensile strength
D. Prevent curing
✔ Correct Answer: C. Increase tensile strength
Explanation: Reinforcing steel compensates for concrete’s weak tensile
properties.
9. A delay caused by extreme weather is classified as:
A. Compensable delay
B. Non-excusable delay
C. Excusable non-compensable delay
D. Critical delay
✔ Correct Answer: C. Excusable non-compensable delay
Explanation: Weather delays are typically excusable but do not warrant
compensation.
10.What is the first step in risk management?
A. Risk mitigation
B. Risk identification
C. Risk transfer