WITH FULL PRACTICE SOLUTION
●● NPDES
Answer: Regulations for monitoring storm water activity on a
construction site, are outlined in
●● Immediately after project is awarded and before you begin any site
work
Answer: When should you read and understand SWPP
●● Contaminated ground water
Answer: What is not an allowable storm water discharge or non-storm
water discharge
●● When jurisdiction of operations specifies you can start
Answer: When may construction activity begin
●● 303D list
Answer: Waters that fail anti-degradation list are placed on which list.
●● An officer and project owner
Answer: SWPPPs certification are signed by who
,●● FALSE
Answer: The document that must be completed signed and submitted to
the state to obtain authorization to discharge is the NOT. (T/F)
●● All construction has been completed both inside and outside
Answer: NOT can be filed when
●● is in charge of daily activities
Answer: Operations on a construction site are the entity in charge of
plans and specification and the entity who?
●● Stay out of trouble with the law
Answer: Motives for staying in compliance with storm water objectives?
●● To protect and preserve beneficial use of U.S. waters, maintaining
their clean, physical and biological integrity
Answer: Objectives of the clean water act are
●● National Pollutant Discharge Elimination System
Answer: NPDES stands for
, ●● Site description and maps, inspection and maintenance procedure.
Potential pollutant sources, schedules of activities, site contact
information, plan certification documents, site contact info and
descriptions of controls BMP
Answer: Which are a component of a good SWPPP
●● False
Answer: Construction sediment is not considered a potential pollutant
source (T/F)
●● Project owner, SWPPP designer
Answer: When modifying or substituting a storm water BMP the
contractor must consult with
●● False
Answer: NOI must be submitted to the appropriate agency before the
storm water pollution preventive plan is developed (T/F)
●● False, 303d List
Answer: Name of the list with impaired waters is called totally daily
maximum load (T/F)