1. What is the primary purpose of curing freshly placed concrete?
A. Increase workability
B. Prevent segregation
C. Maintain moisture for hydration
D. Accelerate setting time
Correct Answer: C ✓ [Maintain moisture for hydration]
Rationale: Curing ensures adequate moisture and temperature conditions so
cement hydration can continue, resulting in proper strength development and
durability.
2. Which factor most significantly affects concrete workability?
A. Cement color
B. Water-cement ratio
C. Aggregate shape only
D. Reinforcement spacing
,Correct Answer: B ✓ [Water-cement ratio]
Rationale: The water-cement ratio directly controls slump, consistency, and
workability of fresh concrete.
3. What is the standard test used to measure concrete consistency in the
field?
A. Compression test
B. Slump test
C. Air content test
D. Unit weight test
Correct Answer: B ✓ [Slump test]
Rationale: The slump test is the most common field method to evaluate concrete
workability and consistency.
4. Excessive vibration of concrete primarily leads to:
A. Increased air content
B. Segregation of materials
C. Higher slump retention
D. Faster curing
Correct Answer: B ✓ [Segregation of materials]
Rationale: Over-vibration causes separation of aggregates from cement paste,
weakening the concrete mix.
5. What is the minimum recommended curing period for standard concrete
under normal conditions?
A. 1 day
B. 3 days
C. 7 days
D. 28 days
,Correct Answer: C ✓ [7 days]
Rationale: Most specifications require at least 7 days of curing for normal Portland
cement concrete to develop adequate strength.
6. Air entrainment in concrete is primarily used to:
A. Increase density
B. Improve freeze-thaw durability
C. Reduce cement content
D. Accelerate hydration
Correct Answer: B ✓ [Improve freeze-thaw durability]
Rationale: Air entrainment creates microscopic air bubbles that improve
resistance to freeze-thaw cycles.
7. What happens when too much water is added to a concrete mix?
A. Increased strength
B. Reduced permeability
C. Decreased strength
D. Faster finishing time
Correct Answer: C ✓ [Decreased strength]
Rationale: Excess water increases porosity after evaporation, significantly reducing
compressive strength.
8. Concrete segregation refers to:
A. Chemical reaction of cement
B. Separation of coarse aggregate from mortar
C. Loss of moisture during curing
D. Excessive air entrainment
, Correct Answer: B ✓ [Separation of coarse aggregate from mortar]
Rationale: Segregation occurs when components of concrete separate during
handling or placement.
9. Which tool is commonly used to finish concrete surfaces?
A. Rebar cutter
B. Bull float
C. Jackhammer
D. Trowel machine
Correct Answer: B ✓ [Bull float]
Rationale: A bull float is used to smooth and level freshly placed concrete
surfaces.
10.The purpose of a vapor barrier under slabs is to:
A. Increase slump
B. Prevent moisture migration from soil
C. Speed up curing
D. Increase reinforcement strength
Correct Answer: B ✓ [Prevent moisture migration from soil]
Rationale: Vapor barriers reduce water vapor movement that can damage slab
performance and flooring systems.
11.What is the typical range for concrete slump in flatwork applications?
A. 0–1 inch
B. 1–4 inches
C. 6–10 inches
D. 10–15 inches