What is the definition of soil and foundation work? - ans-Grading in soil or installing
zx zx zx zx zx zx zx zx zx zxzx zx zx zx zx zx




underpinning, Augering in soil or removing sheeting, Excavating and drilling in soil or rock zx zx zx zx zx zx zx zx zx zx zx zx zx




When contractors use light duty two-point adjustable suspended scaffolds in NYC, what -
zx zx zx zx zx zx zx zx zx zx zx zx




ans-¾'' grade #1 unspliced manila rope
zxzx zx zx zx zx zx




At what grade must power buggy brakes be capable of being fixed in engagement to hold a f
zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx




ull load stationary? - ans-25% grade
zx zx zx zxzx zx




The definition of _____________ is: a horizontal transverse scaffold member (which may b
zx zx zx zx zx zx zx zx zx zx zx zx




e supported by legs or runners) upon which the scaffold platform rests and joins scaffold up
zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx




rights, posts, poles, and similar members - ans-Bearer (putlog)
zx zx zx zx zx zx zxzx zx




The deck and the substantial enclosure of a sidewalk shed shall be extended parallel to the
zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx




curb at least 20 feet beyond the building line when construction is_______ - ans-
zx zx zx zx zx zx zx zx zx zx zx zx zxzx




greater than 100 feet zx zx zx




In structures undergoing demolition, how must the existing sprinkler system be maintained
zx zx zx zx zx zx zx zx zx zx zx zx




- ans-Non-
zxzx




automatic and Siamese hose connections shall be marked by a metal sign reading "Sprinkl
zx zx zx zx zx zx zx zx zx zx zx zx zx




er Siamese Connection" and by a red-light bulb at night
zx zx zx zx zx zx zx zx zx




A ramp for a power buggy must be designed to support how many times the maximum inten
zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx




ded live load - ans-4 zx zx zx zxzx




The permanent floors of skeleton steel construction shall be installed as soon as possible a
zx zx zx zx zx zx zx zx zx zx zx zx zx zx




s steel installation progresses. In no case shall there be more than _________ or equivalen
zx zx zx zx zx zx zx zx zx zx zx zx zx zx




t levels or __________, whichever is less, between the erection floor and the uppermost pe
zx zx zx zx zx zx zx zx zx zx zx zx zx zx




rmanent floor. - ans-8 stories, 120 feet zx zx zxzx zx zx zx




If an open excavation has been discontinued or interrupted for at least ___ months, the lot s
zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx




hall be filled and graded to eliminate all steep slopes, holes, obstructions, or similar sources
zx zx zx zx zx zx zx zx zx zx zx zx zx zx




of hazard. - ans-3
zx zx zx zxzx




Excavated material and superimposed loads such as equipment, trucks, etc., shall not be p
zx zx zx zx zx zx zx zx zx zx zx zx zx




laced closer to the edge of the excavation than a distance equal __________ the depth of s
zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx




uch excavation, unless the excavation is in rock or unless the sides of the excavation have
zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx




been sloped or sheet piled (or sheeted) and shored to withstand the lateral force imposed b
zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx




y such superimposed loads. - ans-to one and one-half times
zx zx zx zx zxzx zx zx zx zx

, The Commissioner shall inquire into the cause of any accident involving equipment. When
zx zx zx zx zx zx zx zx zx zx zx zx zx




an accident involves any piece of equipment on the site, no person shall do the following wit
zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx




hout the permission of the Commissioner: - ans-
zx zx zx zx zx zx zxzx




Use such equipment or remove the equipment or any part thereof from the area of the job sit
zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx




e

According to 3314.8.2, the scaffold shall be enclosed with debris netting consisting of a wire
zx zx zx zx zx zx zx zx zx zx zx zx zx zx




screen comprised of not less than _____ wire mesh, or equivalent synthetic with a maximu
zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx




m _________ mesh. - ans-No. 18 steel, one-half inch
zx zx zx zxzx zx zx zx zx




According to NYC DOB, how many years is the 32- zx zx zx zx zx zx zx zx zx




Hour Rigging Supervisor Training valid for and how many hours is the required refresher co
zx zx zx zx zx zx zx zx zx zx zx zx zx zx




urse? - ans-4 years and 16 hours zx zxzx zx zx zx zx




Specific to foundation operations that affect adjacent properties: The owner of the property
zx zx zx zx zx zx zx zx zx zx zx zx zx




that may be affected shall be given ____ days written notice of the intention to perform such
zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx




operations. - ans-10 zx zxzx




According to Chapter 3301, any construction equipment that would affect public safety mus
zx zx zx zx zx zx zx zx zx zx zx zx




t be inspected before use with the exception of - ans-Hand tools
zx zx zx zx zx zx zx zx zx zxzx zx




Who shall inspect construction equipment that might affect public safety before it is used for
zx zx zx zx zx zx zx zx zx zx zx zx zx zx z




a specific job at the construction site? - ans-
x zx zx zx zx zx zx zx zxzx




Competent person designated by the contractor zx zx zx zx zx




What are the four main suspended scaffolds inspections mandated by the NYC Building Co
zx zx zx zx zx zx zx zx zx zx zx zx zx




de (Chapter 33 Section 3314-scaffolds)? - ans-
zx zx zx zx zx zxzx




Prior to installation, installation inspection, pre-shift, and after repair or adjustment.
zx zx zx zx zx zx zx zx zx zx




Whenever the working deck reaches a height greater than ____ stories, at least one elevat
zx zx zx zx zx zx zx zx zx zx zx zx zx zx




or must be kept in readiness for the fire department? - ans-7
zx zx zx zx zx zx zx zx zx zx zxzx




If the top deck of the sidewalk shed is not built solidly against the face of the structure in suc
zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx




h a manner that no material can fall onto the sidewalk, what must be done? - ans-
zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx zxzx




The side of the shed toward the structure shall be solidly sealed with wood or other suitable
zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx




material for the full height of the shed zx zx zx zx zx zx zx




Specific to regulations in NYC about erecting/ zx zx zx zx zx zx




removing wood pole scaffolds: When a new working level is desired, the existing________
zx zx zx zx zx zx zx zx zx zx zx zx zx




shall be left undisturbed until the new working level is framed. - ans-Planks
zx zx zx zx zx zx zx zx zx zx zx zxzx




Sidewalk shed decks on buildings less than 100 feet in height may be designed and constru
zx zx zx zx zx zx zx zx zx zx zx zx zx zx zx




cted to carry live loads of how many pounds per square foot? - ans-. 150 lbs.
zx zx zx zx zx zx zx zx zx zx zx zx zxzx zx zx

Document information

Uploaded on
June 23, 2026
Number of pages
8
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$14.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
VICTORYSUCCESS
3.0
(2)
Sold
16
Followers
0
Items
2227
Last sold
4 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions