ASTQB/ISTQB - Foundation Level Tester -
Exam 1 Questions With Correct Answers
What is the test basis?
| | | |
a. The point during software development when testing should start
| | | | | | | | |
b. The body of knowledge used for test analysis and design
| | | | | | | | | |
c. The source to determine the actual results from a set of tests
| | | | | | | | | | | |
d. The method used to systematically devise test conditions
| | | | | | | |
Keyword - CORRECT ANSWER✔✔-b. The body of knowledge used for
| | | | | | | | | |
test analysis and design
| | |
When the tester verifies the test basis while designing tests early in the
| | | | | | | | | | | | |
lifecycle, which common test objective is being achieved?
| | | | | | |
a. Gaining confidence
| |
b. Finding defects
| |
c. Preventing defects
| |
d. Providing information for decision making
| | | | |
,FL-1.1.1 - CORRECT ANSWER✔✔-c. Preventing defects
| | | | |
When following the fundamental test process, when should the test
| | | | | | | | | |
control activity take place? | | |
a. During the planning activities
| | | |
b. During the implementation and execution activities
| | | | | |
c. During the monitoring activities
| | | |
d. During all the activities
| | | |
FL-1.4.2 - CORRECT ANSWER✔✔-d. During all the activities
| | | | | | |
Which of the following is a correct statement?
| | | | | | |
a. A developer makes a mistake which causes a defect that may be seen
| | | | | | | | | | | | | |
as a failure during dynamic testing
| | | | |
b. A developer makes an error which results in a failure that may be
| | | | | | | | | | | | | |
seen as a fault when the software is executed
| | | | | | | |
c. A developer has introduced a failure which results in a defect that
| | | | | | | | | | | | |
may be seen as a mistake during dynamic testing
| | | | | | | |
d. A developer makes a mistake which causes a bug that may be seen as
| | | | | | | | | | | | | | |
a defect when the software is executed
| | | | | |
, FL-1.2.3 - CORRECT ANSWER✔✔-a. A developer makes a mistake which
| | | | | | | | | |
causes a defect that may be seen as a failure during dynamic testing
| | | | | | | | | | | |
Which of the following is an example of debugging?
| | | | | | | |
a. A tester finds a defect and reports it
| | | | | | | | |
b. A tester retests a fix from the developer and finds a regression
| | | | | | | | | | | |
c. A developer finds and fixes a defect
| | | | | | |
d. A developer performs unit testing
| | | | |
FL-1.1.2 - CORRECT ANSWER✔✔-c. A developer finds and fixes a defect
| | | | | | | | | |
Which of the following is a true statement about exhaustive testing?
| | | | | | | | | |
a. It is a form of stress testing
| | | | | | |
b. It is not feasible except in the case of trivial software
| | | | | | | | | | |
c. It is commonly done with test automation
| | | | | | |
d. It is normally the responsibility of the developer during unit testing
| | | | | | | | | | |
FL1.3.1 - CORRECT ANSWER✔✔-b. It is not feasible except in the case of
| | | | | | | | | | | |
trivial software
| |
Exam 1 Questions With Correct Answers
What is the test basis?
| | | |
a. The point during software development when testing should start
| | | | | | | | |
b. The body of knowledge used for test analysis and design
| | | | | | | | | |
c. The source to determine the actual results from a set of tests
| | | | | | | | | | | |
d. The method used to systematically devise test conditions
| | | | | | | |
Keyword - CORRECT ANSWER✔✔-b. The body of knowledge used for
| | | | | | | | | |
test analysis and design
| | |
When the tester verifies the test basis while designing tests early in the
| | | | | | | | | | | | |
lifecycle, which common test objective is being achieved?
| | | | | | |
a. Gaining confidence
| |
b. Finding defects
| |
c. Preventing defects
| |
d. Providing information for decision making
| | | | |
,FL-1.1.1 - CORRECT ANSWER✔✔-c. Preventing defects
| | | | |
When following the fundamental test process, when should the test
| | | | | | | | | |
control activity take place? | | |
a. During the planning activities
| | | |
b. During the implementation and execution activities
| | | | | |
c. During the monitoring activities
| | | |
d. During all the activities
| | | |
FL-1.4.2 - CORRECT ANSWER✔✔-d. During all the activities
| | | | | | |
Which of the following is a correct statement?
| | | | | | |
a. A developer makes a mistake which causes a defect that may be seen
| | | | | | | | | | | | | |
as a failure during dynamic testing
| | | | |
b. A developer makes an error which results in a failure that may be
| | | | | | | | | | | | | |
seen as a fault when the software is executed
| | | | | | | |
c. A developer has introduced a failure which results in a defect that
| | | | | | | | | | | | |
may be seen as a mistake during dynamic testing
| | | | | | | |
d. A developer makes a mistake which causes a bug that may be seen as
| | | | | | | | | | | | | | |
a defect when the software is executed
| | | | | |
, FL-1.2.3 - CORRECT ANSWER✔✔-a. A developer makes a mistake which
| | | | | | | | | |
causes a defect that may be seen as a failure during dynamic testing
| | | | | | | | | | | |
Which of the following is an example of debugging?
| | | | | | | |
a. A tester finds a defect and reports it
| | | | | | | | |
b. A tester retests a fix from the developer and finds a regression
| | | | | | | | | | | |
c. A developer finds and fixes a defect
| | | | | | |
d. A developer performs unit testing
| | | | |
FL-1.1.2 - CORRECT ANSWER✔✔-c. A developer finds and fixes a defect
| | | | | | | | | |
Which of the following is a true statement about exhaustive testing?
| | | | | | | | | |
a. It is a form of stress testing
| | | | | | |
b. It is not feasible except in the case of trivial software
| | | | | | | | | | |
c. It is commonly done with test automation
| | | | | | |
d. It is normally the responsibility of the developer during unit testing
| | | | | | | | | | |
FL1.3.1 - CORRECT ANSWER✔✔-b. It is not feasible except in the case of
| | | | | | | | | | | |
trivial software
| |