Terms in this set (309)
What is the best skill essential to a Problem Solving
project managers success that will
result in a "best solution" outcome?
Cost control involves the use of Change methods, change techniques, or change
"comparisons" to indicate the need crew composition to earn profit
to do what?
What are the 5 phases of the Predesign, Design, Bid/Award, Construction, Post
construction process? Construction
Which of the following is a B. Revised Scope of Work
fundamental element of a contract?
A. Time extension
B. Revised Scope of work
C. Mutual acceptance
D. Exchange of money
https://quizlet.com/1191294622/construction-project-administration-textbook-exam-chapters-1-17-exam-2026-questions-answers-with-verified-answer… 1/56
,6/23/26, 10:11 AM Construction Project Administration Textbook Exam Chapters 1-17 EXAM - 2026 (Questions + Answers) with verified Answers (Lat…
Which of the following contract A. Lump Sum
types have the most risk for the
contractor?
A. Lump Sum
B. Unit Price
C. Cost plus
D. Cost plus GMP
Which of the following contract A. Unit Price
types are best used if the scope is
defined but not the quantities of
material?
A. Unit Price
B. Lump Sum
C. Cost Plus
D. Cost Plus GMP
What is the advantage of forming a B. Reduced personal liability of shareholders
corporation?
A. Value of corporation can't go
down from initial purchase price
B. Reduced personal liability of
shareholders
C. Less taxes paid than limited
liability corporation
D. Quick decision making especially
for large companies
In the construction industry, which D. Joint ventures
legal entity is often a temporary
arrangement?
A. Partnership
B. Sole proprietorship
C. Limited liability corporation
D. Joint ventures
https://quizlet.com/1191294622/construction-project-administration-textbook-exam-chapters-1-17-exam-2026-questions-answers-with-verified-answer… 2/56
,6/23/26, 10:11 AM Construction Project Administration Textbook Exam Chapters 1-17 EXAM - 2026 (Questions + Answers) with verified Answers (Lat…
True/False: The traditional project True
delivery system, also frequently
referred to as "design-bid-build" has
been the most used project delivery
system since the late 1800s
True/False: In the traditional project False
delivery system, the contractor is
responsible for providing the labor,
material, equipment, and
construction documents, based on
the owner's needs.
True/False: In the traditional project False
delivery system, the capital projects
officer is concerned primarily with
the disbursement of funds for the
project.
True/False: In the CM delivery False
system, the design manager is
responsible for the coordination of
shop drawings, submittals, layout,
subcontractor organization, payment
verification, and whatever duties are
assigned by the construction
superintendent or construction
administrator.
True/False: The Engineering- False
Procurement-Construction (E-P-C)
system is a common delivery system
for light construction facilities.
https://quizlet.com/1191294622/construction-project-administration-textbook-exam-chapters-1-17-exam-2026-questions-answers-with-verified-answer… 3/56
, 6/23/26, 10:11 AM Construction Project Administration Textbook Exam Chapters 1-17 EXAM - 2026 (Questions + Answers) with verified Answers (Lat…
True/False: CM-at-Risk is similar to True
the GMP arrangement in the
traditional system, except that the
construction manager is involved in
the conception and design of he
project rather than entering after the
completion of the contract
documents.
True/False: In an Agency CM True
contracting arrangement, the
construction manager does not have
design or construction
responsibilities.
True/False: In the Agency CM False
delivery system, the architect has a
contract with the CM, but all prime
contractors have contracts only with
the Owner.
True/False: Some design-build firms True
contract out both the architectural
and construction services
components of a project.
True/False: One design-build True
delivery system is a hybrid of the
others where a design and
contracting firm form a joint
venture/partnership for one specific
project. The venture/partnership is
usually dissolved when the project is
complete.
https://quizlet.com/1191294622/construction-project-administration-textbook-exam-chapters-1-17-exam-2026-questions-answers-with-verified-answer… 4/56
Construction Project Administration Textbook
Exam Chapters 1-17 EXAM - 2026 (Questions +
Answers) with verified Answers (Latest Update
2026) UPDATE!!
Save Add to calendar
Terms in this set (309)
What is the best skill essential to a Problem Solving
project managers success that will
result in a "best solution" outcome?
Cost control involves the use of Change methods, change techniques, or change
"comparisons" to indicate the need crew composition to earn profit
to do what?
What are the 5 phases of the Predesign, Design, Bid/Award, Construction, Post
construction process? Construction
Which of the following is a B. Revised Scope of Work
fundamental element of a contract?
A. Time extension
B. Revised Scope of work
C. Mutual acceptance
D. Exchange of money
https://quizlet.com/1191294622/construction-project-administration-textbook-exam-chapters-1-17-exam-2026-questions-answers-with-verified-answer… 1/56
,6/23/26, 10:11 AM Construction Project Administration Textbook Exam Chapters 1-17 EXAM - 2026 (Questions + Answers) with verified Answers (Lat…
Which of the following contract A. Lump Sum
types have the most risk for the
contractor?
A. Lump Sum
B. Unit Price
C. Cost plus
D. Cost plus GMP
Which of the following contract A. Unit Price
types are best used if the scope is
defined but not the quantities of
material?
A. Unit Price
B. Lump Sum
C. Cost Plus
D. Cost Plus GMP
What is the advantage of forming a B. Reduced personal liability of shareholders
corporation?
A. Value of corporation can't go
down from initial purchase price
B. Reduced personal liability of
shareholders
C. Less taxes paid than limited
liability corporation
D. Quick decision making especially
for large companies
In the construction industry, which D. Joint ventures
legal entity is often a temporary
arrangement?
A. Partnership
B. Sole proprietorship
C. Limited liability corporation
D. Joint ventures
https://quizlet.com/1191294622/construction-project-administration-textbook-exam-chapters-1-17-exam-2026-questions-answers-with-verified-answer… 2/56
,6/23/26, 10:11 AM Construction Project Administration Textbook Exam Chapters 1-17 EXAM - 2026 (Questions + Answers) with verified Answers (Lat…
True/False: The traditional project True
delivery system, also frequently
referred to as "design-bid-build" has
been the most used project delivery
system since the late 1800s
True/False: In the traditional project False
delivery system, the contractor is
responsible for providing the labor,
material, equipment, and
construction documents, based on
the owner's needs.
True/False: In the traditional project False
delivery system, the capital projects
officer is concerned primarily with
the disbursement of funds for the
project.
True/False: In the CM delivery False
system, the design manager is
responsible for the coordination of
shop drawings, submittals, layout,
subcontractor organization, payment
verification, and whatever duties are
assigned by the construction
superintendent or construction
administrator.
True/False: The Engineering- False
Procurement-Construction (E-P-C)
system is a common delivery system
for light construction facilities.
https://quizlet.com/1191294622/construction-project-administration-textbook-exam-chapters-1-17-exam-2026-questions-answers-with-verified-answer… 3/56
, 6/23/26, 10:11 AM Construction Project Administration Textbook Exam Chapters 1-17 EXAM - 2026 (Questions + Answers) with verified Answers (Lat…
True/False: CM-at-Risk is similar to True
the GMP arrangement in the
traditional system, except that the
construction manager is involved in
the conception and design of he
project rather than entering after the
completion of the contract
documents.
True/False: In an Agency CM True
contracting arrangement, the
construction manager does not have
design or construction
responsibilities.
True/False: In the Agency CM False
delivery system, the architect has a
contract with the CM, but all prime
contractors have contracts only with
the Owner.
True/False: Some design-build firms True
contract out both the architectural
and construction services
components of a project.
True/False: One design-build True
delivery system is a hybrid of the
others where a design and
contracting firm form a joint
venture/partnership for one specific
project. The venture/partnership is
usually dissolved when the project is
complete.