The minimum blowdown for a spring loaded safety valve shall be of what percent of set
|| || || || || || || || || || || || || || || ||
pressure? - ✔✔10% || ||
How is the main steam pressure gages tested? - ✔✔With an inspectors gage
|| || || || || || || || || || || ||
Who is in charge of the code for any plumbing installations? - ✔✔The nyc plumbing code
|| || || || || || || || || || || || || || ||
When will anchorage or guides be inspected? - ✔✔Annually
|| || || || || || || ||
How many brass washout plugs does a miniature boiler have? - ✔✔3 brass washout plugs,
|| || || || || || || || || || || || || || ||
1" in size
|| ||
How often is HP piping expansion joints inspected? - ✔✔Weekly
|| || || || || || || || ||
How long should a hydronic system be pressure tested for? - ✔✔2 hours at no less than 100
|| || || || || || || || || || || || || || || || || ||
psig
How is a gage protected from excessive pressure? - ✔✔Shut off cock
|| || || || || || || || || || ||
Who is authorized to witness a test on a gas piping system? - ✔✔Plumbing inspector,
|| || || || || || || || || || || || || || ||
architect, licensed PE, master plumber, agency by the DOB
|| || || || || || || ||
How should a remote disconnect be labeled? - ✔✔Remote control for burner
|| || || || || || || || || || ||
,2
When is a fusible plug not needed to be installed on a boiler? - ✔✔Over 200 psig
|| || || || || || || || || || || || || || || ||
When shall a power boiler with a MAWP over 400 be tested? - ✔✔Pressure tested annually
|| || || || || || || || || || || || || || ||
What shall a design plan of a boiler and application contain but not limited to? - ✔✔Size,
|| || || || || || || || || || || || || || || || ||
location, operating pressure + temperature of the pressure vessel and type + specs of PRV
|| || || || || || || || || || || || || ||
Who is responsible for maintaining the copies of the certified welder qualifications report? -
|| || || || || || || || || || || || || ||
✔✔The welding agency and shall be available to the DOB
|| || || || || || || || ||
Who needs to furnish a control diagram and boiler operation instructions? - ✔✔The
|| || || || || || || || || || || || ||
installer
Who will certify and calibrate all gages utilized for testing? - ✔✔A testing operator
|| || || || || || || || || || || || ||
What shall be placed in between different joints and piping material? - ✔✔An approved
|| || || || || || || || || || || || || ||
adapter fitting ||
What items are exempt from the reporting requirements? - ✔✔The seal welds of the tubes
|| || || || || || || || || || || || || || ||
and the installation of back rings to man holes and hand holes to boilers
|| || || || || || || || || || || || ||
Who will be under control for any welding done to a high pressure tank? - ✔✔An engineer
|| || || || || || || || || || || || || || || || ||
supervising a welding inspection agency acceptable to the DOB || || || || || || || ||
At what pressure is it requires to have extra heavy valves installed? - ✔✔100 psig
|| || || || || || || || || || || || || ||
,2
The ______ files an application for a boiler alteration? - ✔✔Inspector
|| || || || || || || || || ||
How many safety valves does a boiler have with over 500 square feet of heating surface? -
|| || || || || || || || || || || || || || || || ||
✔✔2
Gas fired boilers not exceeding 100 square feet of heating surface shall be provided with a? -
|| || || || || || || || || || || || || || || || ||
✔✔Single or double cone type of hood diverter in the stack
|| || || || || || || || || ||
A heater for either liquid fuels or other liquids harmful to the boiler shall not be installed? -
|| || || || || || || || || || || || || || || || || ||
✔✔Directly in the steam or water space within the boiler || || || || || || || || ||
Who is responsible for any spatial relationship between tanks and gas services? - ✔✔The
|| || || || || || || || || || || || || ||
installer of the last installation to correct a violation
|| || || || || || || ||
Who is responsible for the setting of operating and safety controls? - ✔✔The Installing
|| || || || || || || || || || || || || ||
Company
With what safety fitting shall you protect high pressure steam and water boilers with? -
|| || || || || || || || || || || || || || ||
✔✔Dual low water cut outs || || || ||
Spring loaded safety valves have a total combined relieve capacity of? - ✔✔100% of the max
|| || || || || || || || || || || || || || || ||
designed capacity of the boiler || || || ||
What is the total combined relieving capacity of power actuated relieving valves? - ✔✔No
|| || || || || || || || || || || || || ||
less the 10% of the MAWP or no higher then 20% above the MAWP
|| || || || || || || || || || || || ||
What is the minimum blowdown for a spring loaded safety valve? - ✔✔2%
|| || || || || || || || || || || ||
, 2
When a boiler is derated what changes? - ✔✔The MAWP decreases and the BTU output
|| || || || || || || || || || || || || ||
In hydronic piping systems where shall a shutoff valve be installed? - ✔✔Before and after
|| || || || || || || || || || || || || || ||
the Pressure Reducing Valve
|| || ||
Hydronic piping joints between steel tubing and fittings shall be? - ✔✔Mechanical or
|| || || || || || || || || || || || ||
Welded
What appears on the plate of a boiler? - ✔✔Serial #, name of manufacturer, serial # of
|| || || || || || || || || || || || || || || || ||
manufacturer, MAWP, heating surface, year built and rated steam capacity || || || || || || || || ||
Waste removal of a boiler shall conduct the products of combustion where? - ✔✔To the
|| || || || || || || || || || || || || || ||
atmosphere
When a quick closing valve creates water hammer what is installed on the line? - ✔✔A
|| || || || || || || || || || || || || || || ||
water hammer adapter is installed
|| || || ||
Safety valve capacity may be checked in what 3 ways? - ✔✔Accumulation test, evaporative
|| || || || || || || || || || || || || ||
capacity of feed water and amount of fuel burned
|| || || || || || || ||
Records of inspects are kept where? - ✔✔On the premises
|| || || || || || || || ||
No joint anchorages or guides shall be repaired, replaced or relocated without a work
|| || || || || || || || || || || || || ||
permit issued by the department. This shall not apply to the repacking of a ___ or ___ joint.
|| || || || || || || || || || || || || || || || || ||
- ✔✔Ball or slip joint
|| || || ||
Internal high pressure inspection requires the boiler to be ____, ___, ___, and ___. -
|| || || || || || || || || || || || || || ||
✔✔Shutdown, drained, removal of hand and man holes || || || || || || ||
Nyc high pressure boiler license Exam with accurate detailed
|| || || || || || || || ||
answers
The minimum blowdown for a spring loaded safety valve shall be of what percent of set
|| || || || || || || || || || || || || || || ||
pressure? - ✔✔10% || ||
How is the main steam pressure gages tested? - ✔✔With an inspectors gage
|| || || || || || || || || || || ||
Who is in charge of the code for any plumbing installations? - ✔✔The nyc plumbing code
|| || || || || || || || || || || || || || ||
When will anchorage or guides be inspected? - ✔✔Annually
|| || || || || || || ||
How many brass washout plugs does a miniature boiler have? - ✔✔3 brass washout plugs,
|| || || || || || || || || || || || || || ||
1" in size
|| ||
How often is HP piping expansion joints inspected? - ✔✔Weekly
|| || || || || || || || ||
How long should a hydronic system be pressure tested for? - ✔✔2 hours at no less than 100
|| || || || || || || || || || || || || || || || || ||
psig
How is a gage protected from excessive pressure? - ✔✔Shut off cock
|| || || || || || || || || || ||
Who is authorized to witness a test on a gas piping system? - ✔✔Plumbing inspector,
|| || || || || || || || || || || || || || ||
architect, licensed PE, master plumber, agency by the DOB
|| || || || || || || ||
How should a remote disconnect be labeled? - ✔✔Remote control for burner
|| || || || || || || || || || ||
,2
When is a fusible plug not needed to be installed on a boiler? - ✔✔Over 200 psig
|| || || || || || || || || || || || || || || ||
When shall a power boiler with a MAWP over 400 be tested? - ✔✔Pressure tested annually
|| || || || || || || || || || || || || || ||
What shall a design plan of a boiler and application contain but not limited to? - ✔✔Size,
|| || || || || || || || || || || || || || || || ||
location, operating pressure + temperature of the pressure vessel and type + specs of PRV
|| || || || || || || || || || || || || ||
Who is responsible for maintaining the copies of the certified welder qualifications report? -
|| || || || || || || || || || || || || ||
✔✔The welding agency and shall be available to the DOB
|| || || || || || || || ||
Who needs to furnish a control diagram and boiler operation instructions? - ✔✔The
|| || || || || || || || || || || || ||
installer
Who will certify and calibrate all gages utilized for testing? - ✔✔A testing operator
|| || || || || || || || || || || || ||
What shall be placed in between different joints and piping material? - ✔✔An approved
|| || || || || || || || || || || || || ||
adapter fitting ||
What items are exempt from the reporting requirements? - ✔✔The seal welds of the tubes
|| || || || || || || || || || || || || || ||
and the installation of back rings to man holes and hand holes to boilers
|| || || || || || || || || || || || ||
Who will be under control for any welding done to a high pressure tank? - ✔✔An engineer
|| || || || || || || || || || || || || || || || ||
supervising a welding inspection agency acceptable to the DOB || || || || || || || ||
At what pressure is it requires to have extra heavy valves installed? - ✔✔100 psig
|| || || || || || || || || || || || || ||
,2
The ______ files an application for a boiler alteration? - ✔✔Inspector
|| || || || || || || || || ||
How many safety valves does a boiler have with over 500 square feet of heating surface? -
|| || || || || || || || || || || || || || || || ||
✔✔2
Gas fired boilers not exceeding 100 square feet of heating surface shall be provided with a? -
|| || || || || || || || || || || || || || || || ||
✔✔Single or double cone type of hood diverter in the stack
|| || || || || || || || || ||
A heater for either liquid fuels or other liquids harmful to the boiler shall not be installed? -
|| || || || || || || || || || || || || || || || || ||
✔✔Directly in the steam or water space within the boiler || || || || || || || || ||
Who is responsible for any spatial relationship between tanks and gas services? - ✔✔The
|| || || || || || || || || || || || || ||
installer of the last installation to correct a violation
|| || || || || || || ||
Who is responsible for the setting of operating and safety controls? - ✔✔The Installing
|| || || || || || || || || || || || || ||
Company
With what safety fitting shall you protect high pressure steam and water boilers with? -
|| || || || || || || || || || || || || || ||
✔✔Dual low water cut outs || || || ||
Spring loaded safety valves have a total combined relieve capacity of? - ✔✔100% of the max
|| || || || || || || || || || || || || || || ||
designed capacity of the boiler || || || ||
What is the total combined relieving capacity of power actuated relieving valves? - ✔✔No
|| || || || || || || || || || || || || ||
less the 10% of the MAWP or no higher then 20% above the MAWP
|| || || || || || || || || || || || ||
What is the minimum blowdown for a spring loaded safety valve? - ✔✔2%
|| || || || || || || || || || || ||
, 2
When a boiler is derated what changes? - ✔✔The MAWP decreases and the BTU output
|| || || || || || || || || || || || || ||
In hydronic piping systems where shall a shutoff valve be installed? - ✔✔Before and after
|| || || || || || || || || || || || || || ||
the Pressure Reducing Valve
|| || ||
Hydronic piping joints between steel tubing and fittings shall be? - ✔✔Mechanical or
|| || || || || || || || || || || || ||
Welded
What appears on the plate of a boiler? - ✔✔Serial #, name of manufacturer, serial # of
|| || || || || || || || || || || || || || || || ||
manufacturer, MAWP, heating surface, year built and rated steam capacity || || || || || || || || ||
Waste removal of a boiler shall conduct the products of combustion where? - ✔✔To the
|| || || || || || || || || || || || || || ||
atmosphere
When a quick closing valve creates water hammer what is installed on the line? - ✔✔A
|| || || || || || || || || || || || || || || ||
water hammer adapter is installed
|| || || ||
Safety valve capacity may be checked in what 3 ways? - ✔✔Accumulation test, evaporative
|| || || || || || || || || || || || || ||
capacity of feed water and amount of fuel burned
|| || || || || || || ||
Records of inspects are kept where? - ✔✔On the premises
|| || || || || || || || ||
No joint anchorages or guides shall be repaired, replaced or relocated without a work
|| || || || || || || || || || || || || ||
permit issued by the department. This shall not apply to the repacking of a ___ or ___ joint.
|| || || || || || || || || || || || || || || || || ||
- ✔✔Ball or slip joint
|| || || ||
Internal high pressure inspection requires the boiler to be ____, ___, ___, and ___. -
|| || || || || || || || || || || || || || ||
✔✔Shutdown, drained, removal of hand and man holes || || || || || || ||