Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 10 pages
Exam (elaborations)

ACI Concrete Field Testing Technician Grade 1 Exam-Graded A

Document preview thumbnail
Preview 2 out of 10 pages

ACI Concrete Field Testing Technician Grade 1 Exam-Graded A

Content preview

ACI Concrete Field Testing Technician
Grade 1 Exam-Graded A

Collecting a representative sample of concrete to be tested is as important
as executing the test methods to obtain - ANSWER-accurate results

This practice covers sampling from 4 types of equipment: - ANSWER-stationary,
paving, revolving truck, continuous

The elapsed time between obtaining the first and final portions of a composite
sample shall not exceed - ANSWER-15 minutes

Portions of a composite sample shall be thoroughly remixed before beginning
tests on the sample. True or False? - ANSWER-True

Start tests for slump, temperature, and air content within _____
after obtaining the final portion of the composite sample - ANSWER-5 minutes

Start molding specimens for strength tests within _______ after
fabricating the composite sample - ANSWER-15 minutes

The concrete sample must be protected from contamination and - ANSWER-
evaporation

the minimum size sample for making strength test specimens is - ANSWER-1 cubic foot

When sampling from a stationary mixer, the batch must be sampled at
____ or more regularly spaced intervals during discharge of the
middle portion of the batch. - ANSWER-two

When sampling from a paving mixer, obtain samples from at least ____
different portions of the pile and combine them into one composite sample
for test purposes - ANSWER-five

When sampling from a revolving truck mixer, sample the concrete by collecting
____ or more portions take at regularly spaced intervals during
discharge of the middle portion of the batch. - ANSWER-two

Concrete samples from a truck mixer must be obtained before any water or
admixtures are added to the mixer at the job site. True or False - ANSWER-false

, When the concrete contains aggregate larger than that permitted for a particular
test method, the sample of concrete must be ________ before making the test -
ANSWER-wet screened

What must occur before a sample of concrete can be taken from a revolving drum
mixer? - ANSWER-all water and admixtures must be added to the mixer

When sampling from a stationary or revolving drum mixer, what is collected and when is
it taken during discharge? - ANSWER-- in two or more portions of concrete
- at regularly spaced intervals
- from the middle of the batch

how are the sample portions obtained from the discharge stream of a stationary or
revolving drum mixer? - ANSWER-- repeatedly pass a receptacle through the entire
discharge stream
- completely divert the discharge stream into a sample container

Describe the procedure for collecting a sample from a paving mixer - ANSWER--
discharge the contents of the paving mixer
- obtain the samples from at least 5 different portions of the pile

After the final rodding, the sides of the slump mold should be tapped lightly
with the tamping rod. True or False? - ANSWER-false

When raising the slump mold, it should not be rotated or twisted. True or
False? - ANSWER-true

How much time is allowed for lifting the slump mold? - ANSWER-5 +/- 2 seconds (3-7
seconds)

The measurement for slump is made from the top of the mold to what point
of the concrete specimen? - ANSWER-the displaced original center of the top surface of
the specimen

The slump of the concrete is measured and reported to the nearest ____ - ANSWER-
1/4"

How much time is allowed to conduct the slump test from beginning to
completion? - ANSWER-2.5 minutes

The length of the tamping rod used in this test method is _____ - ANSWER-at least 4"
taller than the height of the measure but no more than 24" in overall length

What is the required shape of the tamping end of the rod? - ANSWER-rounded to a
hemispherical tip

Document information

Uploaded on
June 21, 2026
Number of pages
10
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$16.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
2
Followers
1
Items
855
Last sold
3 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions