Who are the two groups of people a test lead needs to negotiate with? - correct
answer Project management (on schedule and tasks) and developers (on entry
criteria)
What 3 things determine success of a team/product? - correct answer People,
process, and technology
What do inspections require? - correct answer 1. Advance preparation
2. Utilization of rules and checklists
3. Metrics gathering and analysis to facilitate process improvement
What should system testers inspect? - correct answer - Test plan
- Test case
- Test incident report
,Causal Analysis - correct answer Seeks to identify the cause of the defects missed by
testing in order to eliminate future occurrences
What are the different defect cause categories? - correct answer 1. Communication
failure: lack of information
2. Oversight: Failure to consider all combinations
3. Education: Lack of training of the tools
4. Transcription: Simple mistake
How can you avoid communication failures? - correct answer Improve documentation,
have liaisons to other groups, have better processes, add in tracking systems
How can you avoid oversight failures? - correct answer Use checklists, automate, use
templates, and review
How can you avoid education failures? - correct answer Just-in-time training,
tutorials, proper staffing
, How can you avoid transcription failures? - correct answer Tools to automate and
review
CMMI - correct answer Capability Maturity Model Integration:
1. Initial (adhoc)
2. Repeatable (expertise lies in the individual)
3. Defined (processes are defined and documented)
4. Managed (metrics are used extensively to guide the process)
5. Optimizing (emphasis on continuous improvement)
TMMI - correct answer Like CMMI, but for testing, Testing maturity model integration
1. Adhoc (no specific goals, testing begins after code is written)
2. Phase definition (well defined testing phases, goals, and basic methods used)
3. Integration (trained testers, risk managed, integrated with software devs)
4. Management & measurements (metrics are used to review for efficiency and
effectiveness)
5. Optimization, defect prevention, and quality control (root cause analysis, test
process improved, statistical quality control)