The PWS should: - ANSWER A) Include tasks that define the government's desired out-
come of the contract.
B) A measurement method that states how performance will be measured.
D) Express requirements in clear, simple, concise, and legally enforceable language.
Select all listed documentation CORs will maintain in their COR file throughout the life of a
contract. - ANSWER A) Correspondences with the contractor and KO.
B) When assigned, evidence that the 450 OGE is completed annually.
C) Evidence CPARs input has been verified on service contracts.
D) Contract deliverables.
Completed COR status reports (CSR), Surveillance Schedules, and Checklists must be up-
loaded to the Surveillance and Performance Monitoring (SPM) by the 30th of each month. -
ANSWER False
The QASP: - ANSWER B) Will include a completed schedule and checklist.
C) Is prepared in conjunction with the Statement of Work (SOW)
Match the question with the correct response option below: - ANSWER Who nominates a
COR? = RA
Who assigns and authorizes COR responsibilities? = KO
What is COR implied authority based upon? = Appointment Letter
After the end of the Evaluation Period, within how many days are all CPARS inputs due? -
ANSWER 120
1
come of the contract.
B) A measurement method that states how performance will be measured.
D) Express requirements in clear, simple, concise, and legally enforceable language.
Select all listed documentation CORs will maintain in their COR file throughout the life of a
contract. - ANSWER A) Correspondences with the contractor and KO.
B) When assigned, evidence that the 450 OGE is completed annually.
C) Evidence CPARs input has been verified on service contracts.
D) Contract deliverables.
Completed COR status reports (CSR), Surveillance Schedules, and Checklists must be up-
loaded to the Surveillance and Performance Monitoring (SPM) by the 30th of each month. -
ANSWER False
The QASP: - ANSWER B) Will include a completed schedule and checklist.
C) Is prepared in conjunction with the Statement of Work (SOW)
Match the question with the correct response option below: - ANSWER Who nominates a
COR? = RA
Who assigns and authorizes COR responsibilities? = KO
What is COR implied authority based upon? = Appointment Letter
After the end of the Evaluation Period, within how many days are all CPARS inputs due? -
ANSWER 120