CONCRETE FLATWORK TECH AND FLATWORK FINISHER QUESTIONS AND ANSWERS SURE A.pdf

Content preview

CONCRETE FLATWORK TECH AND FLATWORK FINISHER
QUESTIONS AND ANSWERS SURE A+
✔✔Throttle down the machine to avoid moving too much mortar. - ✔✔(Ch. 7, #30) If
you're making float passes with a riding machine and running at full speed, what should
you do when you see that some of the concrete ahead is still wet?

✔✔dry; set - ✔✔(Ch. 7, #31) When only parts of a concrete floor are exposed to the sun
or to wind coming through a door opening, those parts will often _____ and _____
faster.

✔✔backward; edge form - ✔✔(Ch. 7, #32) If concrete at the edges is low during
machine floating, a __________ pass with the float blades or pan over the ______ will
bring more concrete to the edges.

✔✔apply a slight upward pressure on the handle - ✔✔(Ch. 7, #33) To move left with a
walk-behind troweling machine:

✔✔parallel; 2 to 3 - ✔✔(Ch. 7, #34) Where a temporary screed is moved, two different
placements are sometimes made adjacent to each other. When concrete is softer on
one side of the screed's former location, the walk-behind machine should be run
_________ to the seam where the two concretes come together, with the blades
overlapping the seam by about ____ to ____ inches.

✔✔larger; smaller - ✔✔(Ch. 7, #35) When hand floating, float and trowel blades may be
of different sizes, but finishers should always start with the ________ size and then
move to the _________ size.

✔✔1 - ✔✔(Ch. 7, #36) Tilt of a trowel blade is excessive if the leading edge is more
than _____ inch above the concrete surface.

✔✔isolation - ✔✔(Ch. 8, #1) Joints that separate slabs from walls and columns are
called ________ joints.

✔✔Construction - ✔✔(Ch. 8, #2) _____________ joints are stopping places for a day's
work.

✔✔False (both horizontal and vertical movement must be permitted in an isolation joint)
- ✔✔(Ch. 8, #3) True or False: Slabs at isolation joints must be free to move horizontally
but not vertically.

✔✔compressible - ✔✔(Ch. 8, #4) Isolation joint material must be:

, ✔✔False (joint material should extend to the full depth of the joint) - ✔✔(Ch. 8, #5)
Isolation joint material should extend from the top of the slab to one-quarter of the slab
depth.

✔✔minimize random cracks - ✔✔(Ch. 8, #6) Contraction joints:

✔✔True - ✔✔(Ch. 8, #7) True or False: As a general rule, contraction joints that are
spaced closely together are less likely to crack between joints.

✔✔True - ✔✔(Ch. 8, #8) True or False: Reinforcing steel in slabs on ground does not
prevent cracking.

✔✔True - ✔✔(Ch. 8, #9) True or False: Contraction joints are sometimes called control
joints.

✔✔ - ✔✔(Ch. 8, #10)

✔✔feet; 2 to 3; inches - ✔✔(Ch. 8, #11) Spacing of contraction joints is often based on
the rule that the spacing in ______ should be ___ to ___ times the slab thickness in
_______.

✔✔1/4 the slab thickness - ✔✔(Ch. 8, #12) When contraction joints are formed with a
groover, the groover should have a bit deep enough to cut to:

✔✔ravel; random cracking - ✔✔(Ch. 8, #13) If contraction joints are sawed too soon
with a wet-cut saw, the edges of the joint may _______ but if the joints are sawed too
late _________ ________ may occur.

✔✔3rd; 4th; intermediate - ✔✔(Ch. 8, #14) When temperatures are high during the day
and low at night, it's sometimes necessary to saw every _____ or ______ joint before
sawing the __________ joints.

✔✔True - ✔✔(Ch. 8, #15) True or False: During hot weather, it may be possible to saw
contraction joints with wet-cut saws as early as 4 hours after finishing is complete.

✔✔1 hour; 4 hours - ✔✔(Ch. 8, #16) Early-entry, dry-cut saws cut the waiting period
before sawing to as little as ___ ______ in hot weather and about ___ _____ in cold
weather.

✔✔usually cut to a maximum depth of 1.25 inches; should not ride up over hard or large
coarse aggregate; have a skid plate that helps prevent raveling (spalling) at the cut
edges - ✔✔(Ch. 8, #17) Early-entry, dry-cut saws:

Document information

Uploaded on
June 12, 2026
Number of pages
9
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$20.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BOARDWALKer
3.4
(19)
Sold
158
Followers
7
Items
26597
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions