COSC 275 UPDATED STUDY EXAM GUIDE QUESTIONS
AND ANSWERS SURE A+
✔✔Beam - - ✔✔1. A horizontal structural member, such as a girder,rafter, or purlin, that
transversely supports a load and transfers the load to vertical members, such as
columns and walls.
2. The graduated horizontal bar of a weighing scale.

✔✔Column - - ✔✔A long, relatively slender, supporting pillar. A column is usually
loaded axially in compression.

✔✔Moment connection - - ✔✔A rigid connection between structural members that
transfers moment from one member to the other, and thus resists the moment force. A
pinned connection cannot resist moment forces, only shear forces.
Important in seismic areas

✔✔Baseplate - - ✔✔A plate used to distribute vertical loads from structural columns or
machinery.

✔✔Flashing - - ✔✔A thin, impervious sheet of material placed in construction to prevent
water penetration or direct the flow of water. Flashing is used especially at roof hip sand
valleys, roof penetrations, joints between a roof and a vertical wall, and in masonry
walls to direct the flow of water and moisture.

✔✔Concrete masonry - - ✔✔Concrete blocks laid with mortar or grout in a manner
similar to bricks. Concrete that may be poured in place or as special tilt-up building
walls.

✔✔Gypsum sheathing - - ✔✔A type of wallboard whose core is made from gypsum with
which additives have been mixed to make it water-resistant. The sheathing is surfaced
with a water-repellent paper to make it appropriate for exterior wallcoverings.

✔✔Face brick - - ✔✔Brick manufactured to present an attractive appearance. Any brick
that is exposed, such as on a fireplace.

✔✔Number 18 on final is - ✔✔B

✔✔Number 19 on final is - ✔✔C

✔✔Number 5 on final is not - ✔✔C

✔✔ Quantification - ✔✔In estimating an activity to translate project scope information
into resource quantities suitable for costing. In the engineering and construction

, industry, a takeoff is a specific type of quantification that is a measurement and listing of
quantities of materials from drawings

✔✔Quantities - ✔✔Measured amounts of construction items expressed in their
customary units.

✔✔Estimating - - ✔✔The anticipated cost of materials, labor, equipment, or any
combination of these for a proposed construction project.

✔✔Activity - - ✔✔In critical path method (CPM) scheduling, a task or item of work
required to complete a project. Also called task.

✔✔Project - - ✔✔the job as a whole

✔✔Scope - - ✔✔An accurate, detailed, and concise description of the work to be
performed by the contractor, the owner, and third parties in a construction contract.

✔✔Measurement - - ✔✔A quantity survey from plans or a field survey of work to be
done.

✔✔Material - - ✔✔Any product or substance specified for use in the construction of a
project.

✔✔Drawings - - ✔✔The portion of the contract documents that gives a graphic
representation of the work to be done in the construction of a project.

✔✔Specifications - - ✔✔a detailed and exact statement of particulars, especially a
statement prescribing materials, dimensions, and workmanship for something to be built
or installed

✔✔Dimensions - - ✔✔the distance between two points, lines, or planes

✔✔Workmanship - - ✔✔the quality of work performed

✔✔Specs - - ✔✔contraction of specifications

✔✔Specification or specs - - ✔✔Documents that define the qualitative requirements for
products, materials, and workmanship upon which the contract for construction is
based.

✔✔Contract for construction - - ✔✔An agreement between owner and contractor
whereby the contractor agrees to construct the owner's project in accordance with the
contract documents, within a specified amount of time, and for consideration to be paid
by the owner as mutually agreed.

Document information

Uploaded on
June 12, 2026
Number of pages
5
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$19.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EXAMCAFE
3.4
(19)
Sold
154
Followers
7
Items
26055
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions