Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 64 pages
Exam (elaborations)

SEPTIC INSTALLER TEST FOR WASHINGTON STATE WOSSA PAPER 2026/2027 ACTUAL QUESTIONS WITH VERIFIED ANSWERS

Document preview thumbnail
Preview 4 out of 64 pages

SEPTIC INSTALLER TEST FOR WASHINGTON STATE WOSSA PAPER 2026/2027 ACTUAL QUESTIONS WITH VERIFIED ANSWERS SEPTIC INSTALLER TEST FOR WASHINGTON STATE WOSSA PAPER 2026/2027 ACTUAL QUESTIONS WITH VERIFIED ANSWERS SEPTIC INSTALLER TEST FOR WASHINGTON STATE WOSSA PAPER 2026/2027 ACTUAL QUESTIONS WITH VERIFIED ANSWERS

Content preview

SEPTIC INSTALLER TEST FOR WASHINGTON STATE
WOSSA PAPER 2026/2027 ACTUAL QUESTIONS WITH
VERIFIED ANSWERS



ANSI - ✔✔✔ ANSWER-American National Standards Institute



BOD - ✔✔✔ ANSWER-biochemical oxygen demand, typically
expressed in mg/L.



CBOD - ✔✔✔ ANSWER-Carbonaceous Biochemical Oxygen
Demand, expressed in mg/L.



LOSS - ✔✔✔ ANSWER-large on-site sewage system



NSF - ✔✔✔ ANSWER-Nation Sanitation Foundation
International



O&G - ✔✔✔ ANSWER-Oils and Grease, component of sewage
typically originating from food stuffs (animal fats of vegetable
oils) expressed in mg/L.



RS&G - ✔✔✔ ANSWER-Recommended Standards and Guidance



SSAS - ✔✔✔ ANSWER-a subsurface soil absorption system

,TAC - ✔✔✔ ANSWER-Technical Advisory Committee established
in WAC 247-272A-0400



TN - ✔✔✔ ANSWER-Total Nitrogen, expressed in mg/L.



TSS - ✔✔✔ ANSWER-Total Suspended Solids. A measure of the
total suspended solids in a given solution, expressed in mg/L.



USEPA - ✔✔✔ ANSWER-United States Environmental Protection
Agency



Additive - ✔✔✔ ANSWER-a commercial product added to an on-
site sewage system intended to affect the performance or
aesthetics of an on-site sewage system



Approved - ✔✔✔ ANSWER-Acceptable to the authority having
jurisdiction. Local health officer or the department



BED - ✔✔✔ ANSWER-a soil dispersal component consisting of
an excavation with a width greater than 3 feet



Building Sewer - ✔✔✔ ANSWER-that part of the horizontal
piping of a drainage system which starts from the end of the
building drain and which receives the discharge of the
building drain and conveys it to a public sewer, private sewer,
individual sewage disposal system or other point of disposal.
It begins two feet outside the building wall and conveys
sewage from the building drain to the remaining portions of

,the on-site sewage system.



Cesspool - ✔✔✔ ANSWER-a covered hole or pit for receiving
drainage or sewage, as from a house allowing liquid to seep
into the surronding rock or soil



Conforming System - ✔✔✔ ANSWER-an on-site sewage system
of component meeting rules of: New construction
requirements

Approved and installed within previous requirements

Permitted by WAC-246-272A-0420



Cover Material - ✔✔✔ ANSWER-Soil placed over dispersal
component, made up of mineral material with no greater than
10% organic content. Cover may contain organic surface
material, an organic landscaper to help reduce and contain
soil erosion.



FC - ✔✔✔ ANSWER-Fecal Coliform, expressed in number of
colonies 100/ml.



Pressure Distribution Systems, Introductions (Pressure
distribution is usually used in locations where it is either
desirable or required to:) - ✔✔✔ ANSWER-6) distribute effluent
to all sand filters, mounds, all Type 1 soils, and all other soils
with less than 24 inches of vertical separation



Pressure Distribution Systems, Introductions - ✔✔✔ ANSWER-

, Pressure distribution is also appropriate for sites in aquifer
sensitive areas and for larger drainfield systems. Finally, in
certain conditions where pumping is necessary due to
elevation problems, pressure distribution can be incorporated
with only a little additional effort.



Pressure Distribution Systems:

1. Performance Standards

1.1. Intent - ✔✔✔ ANSWER-The intent of pressure distribution
is uniform distribution of effluent throughout the receiving
component.



Pressure Distribution Systems:

1. Performance Standards

1.2. Measure of Performance - ✔✔✔ ANSWER-The variation in
orifice discharge rates within any one lateral must not be
more than 10%,



Pressure Distribution Systems:

1. Performance Standards

1.2. Measure of Performance - ✔✔✔ ANSWER-The variation in
orifice discharge rates over the entire distribution system
must not be more than 15%,



Pressure Distribution Systems:

1. Performance Standards

1.2. Measure of Performance - ✔✔✔ ANSWER-The squirt height

Document information

Uploaded on
June 11, 2026
Number of pages
64
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$22.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
lornezyeng
1.0
(1)
Sold
4
Followers
2
Items
618
Last sold
5 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions