National Electrical Code (NEC) 2026/2027 study guide 1. The NEC is updated on a regular cycle. How many years between editions? ANSWER 3 years 2. Which Article of the NEC contains definitions for terms used throughout the code? ANSWER Article 100 3. A device that opens and closes a circuit by nonautomatic means and automatically closes for a predetermined overcurrent is defined in Article 100 as a: ANSWER Circuit breaker 4. What does the term "Ampacity" mean as defined in NEC Article 100? ANSWER The maximum current a conductor can carry continuously without exceeding its temperature rating 5. According to NEC Article 100, "Continuous Load" means a load where the maximum current is expected to continue for how many hours? ANSWER 3 hours or more 6. Which Article of the NEC covers the requirements for grounding and bonding? ANSWER Article 250 7. Annex _______ of the NEC covers conduit and tubing fill for conductors and fixture wire. ANSWER Annex C 8. What is the primary purpose of a grounding electrode system as outlined in NEC 250.4(A)(1)? ANSWER Limit voltage imposed by lightning, line surges, or unintentional contact with higher-voltage lines 9. NEC Table 250.66 is used to size which component of a grounding system? ANSWER Grounding electrode conductors 10. A main bonding jumper is required to be what color per NEC guidelines? ANSWER Green 11. True or False: A subpanel in the same building requires a bonding screw installed. ANSWER False 12. The minimum size equipment grounding conductor required for a 100-amp overcurrent protective device, according to NEC Table 250.122, is: ANSWER 8 AWG copper 13. According to NEC 250.8, sheet metal screws can be used for bonding only if they are: ANSWER Green with hexagonal heads 14. NEC Article 230 covers requirements for: ANSWER Services (service conductors and equipment) 15. The required clearance for a service drop of not over 600V above a residential property driveway is: ANSWER 12 feet 16. According to NEC 230.9(A), an uninsulated service conductor must be at least how many feet from an operable window? ANSWER 3 feet 17. Which NEC Article covers the installation requirements for Rigid Metal Conduit (RMC)? ANSWER Article 342 18. Which NEC Article covers Electrical Metallic Tubing (EMT)? ANSWER Article 358 19. The requirements for Nonmetallic-Sheathed Cable (Romex®) are found in NEC: ANSWER Article 334

Content preview

National Electrical Code (NEC) 2026/2027
study guide
1. The NEC is updated on a regular cycle. How many years between editions?
ANSWER ✓ 3 years

2. Which Article of the NEC contains definitions for terms used throughout the code?
ANSWER ✓ Article 100

3. A device that opens and closes a circuit by nonautomatic means and automatically
closes for a predetermined overcurrent is defined in Article 100 as a:
ANSWER ✓ Circuit breaker

4. What does the term "Ampacity" mean as defined in NEC Article 100?
ANSWER ✓ The maximum current a conductor can carry continuously without
exceeding its temperature rating

5. According to NEC Article 100, "Continuous Load" means a load where the maximum
current is expected to continue for how many hours?
ANSWER ✓ 3 hours or more

6. Which Article of the NEC covers the requirements for grounding and bonding?
ANSWER ✓ Article 250

7. Annex _______ of the NEC covers conduit and tubing fill for conductors and fixture
wire.
ANSWER ✓ Annex C

8. What is the primary purpose of a grounding electrode system as outlined in NEC
250.4(A)(1)?
ANSWER ✓ Limit voltage imposed by lightning, line surges, or unintentional contact
with higher-voltage lines

9. NEC Table 250.66 is used to size which component of a grounding system?
ANSWER ✓ Grounding electrode conductors

10. A main bonding jumper is required to be what color per NEC guidelines?
ANSWER ✓ Green

, 11. True or False: A subpanel in the same building requires a bonding screw installed.
ANSWER ✓ False

12. The minimum size equipment grounding conductor required for a 100-amp
overcurrent protective device, according to NEC Table 250.122, is:
ANSWER ✓ 8 AWG copper

13. According to NEC 250.8, sheet metal screws can be used for bonding only if they
are:
ANSWER ✓ Green with hexagonal heads

14. NEC Article 230 covers requirements for:
ANSWER ✓ Services (service conductors and equipment)

15. The required clearance for a service drop of not over 600V above a residential
property driveway is:
ANSWER ✓ 12 feet

16. According to NEC 230.9(A), an uninsulated service conductor must be at least how
many feet from an operable window?
ANSWER ✓ 3 feet

17. Which NEC Article covers the installation requirements for Rigid Metal Conduit
(RMC)?
ANSWER ✓ Article 342

18. Which NEC Article covers Electrical Metallic Tubing (EMT)?
ANSWER ✓ Article 358

19. The requirements for Nonmetallic-Sheathed Cable (Romex®) are found in NEC:
ANSWER ✓ Article 334

20. According to NEC 334.12, NM cable (Romex®) is NOT permitted in which of the
following locations?
ANSWER ✓ In dropped ceilings of commercial buildings used as return air plenums

21. What is the minimum bending radius for NM cable according to NEC 334.24?
ANSWER ✓ 5 times the cable diameter

22. Which NEC Article covers the installation of cable trays?
ANSWER ✓ Article 392

Document information

Uploaded on
June 8, 2026
Number of pages
10
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$14.29

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SmartscoreAaron
3.1
(7)
Sold
96
Followers
6
Items
4154
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions