CDT Study Guide with correct answers 100% 2026
CDT Study Guide with correct answers 100% 2026 "Just as needed" team involvement to reduce owners pre-construction expenses - Correct Answer Integrated projects are distinguished by all of the following characteristics EXCEPT: a. Previous negative experience with adversarial project team relationships b. Desire for reduction in project claims and disputes c. Desire to utilize collaboratively-produced BIM as a facilities management asset d. Expectation of benefit from innovation stemming from collaborative effort e. All of the above - Correct Answer Experienced owners may require project teams to utilize integrated project delivery based upon Team culture based upon problem resolution rather than determination of liability - Correct Answer Which of the following is TRUE concerning application of integrated project delivery? CSI validates and certifies information contained in Green Format - Correct Answer The following are TRUE concerning CSIs GreenFormat online product data resource EXCEPT Market analysis of demand for sustainable products - Correct Answer According to the BEES model, life cycle analysis (LCA) is characterized by all of the following EXCEPT Provide a rational assessment of the environmental impact of building products - Correct Answer The goal of ASTM sustainability standards, the EPA Energy Star program, and the NIST BEES program is to Automated product characteristic/ specification content coordination - Correct Answer Which of the following is not included in the quoted description of benefits that BIM brings to the design and construction process? The delivery of the facility to the owner - Correct Answer The goal of the project is defined by the PDPG as a. Conceptualization b. Criteria Design
Document information
- Uploaded on
- June 7, 2026
- Number of pages
- 14
- Written in
- 2025/2026
- Type
- Exam (elaborations)
- Contains
- Questions & answers