Occurs when the rate, latency, duration, or amplitude of a response is
altered in the presence of an antecedent stimulus.
Choose an answer
1 Concurrent schedule 2 Variable ratio
3 stimulus control 4 Multiple schedule
Don't know?
Terms in this set (85)
, Concurrent schedule Reinforcement schedule with:
-2+ component schedules
-2+ response classes
-possible SDs for each schedule
-simultaneous presentation of component
schedules
-must meet response requirements of each
schedule to gain R+
Concurrent schedule Compound schedule used to create hypotheses
about R+ in the subject's environment
Chain schedule Reinforcement schedule with:
-2+ component schedules
-1+ response class
-SDs for each component schedule
-schedules are presented successively in a
specific order
-R+ is only available for the final component
schedule
-does not need to meet response requirements
for each component schedule to produce R+
Answers (Verified Answers) 2026/27 | Graded A+
Save
Practice questions for this set
Learn 1 /7 Study with Learn
Occurs when the rate, latency, duration, or amplitude of a response is
altered in the presence of an antecedent stimulus.
Choose an answer
1 Concurrent schedule 2 Variable ratio
3 stimulus control 4 Multiple schedule
Don't know?
Terms in this set (85)
, Concurrent schedule Reinforcement schedule with:
-2+ component schedules
-2+ response classes
-possible SDs for each schedule
-simultaneous presentation of component
schedules
-must meet response requirements of each
schedule to gain R+
Concurrent schedule Compound schedule used to create hypotheses
about R+ in the subject's environment
Chain schedule Reinforcement schedule with:
-2+ component schedules
-1+ response class
-SDs for each component schedule
-schedules are presented successively in a
specific order
-R+ is only available for the final component
schedule
-does not need to meet response requirements
for each component schedule to produce R+