Union Pacific training rules study guide first 42,,
Questions and Correct Detailed Answers
(Verified Answers) 2026/27 | Graded A+
Save
Terms in this set (42)
A crew is called on duty at 10 hours and minute for minute over 12 hours
Sunflower Yard ( Orange
subdivision ) at 0600 hours for Pool
Freight HOS relief . A contract
vehicle will transport the crew to
Tucson siding ( Fiesta subdivision )
where they will add a locomotive to
the lead consist of a distributed
power train that was previously
secured on the siding track and
then operate the train southward to
Corvallis , stopping at Los Angeles
for an enroute work event .
1 . On the engineer's previous start ,
the total trip time was 11 hours and
15 minutes . How much rest was
required prior to this start ? 1.17
, A crew is called on duty at Yes
Sunflower Yard ( Orange
subdivision ) at 0600 hours for Pool
Freight HOS relief . A contract
vehicle will transport the crew to
Tucson siding ( Fiesta subdivision )
where they will add a locomotive to
the lead consist of a distributed
power train that was previously
secured on the siding track and
then operate the train southward to
Corvallis , stopping at Los Angeles
for an enroute work event . 1 . On
the engineer's previous start , the
total trip time was 11 hours and 15
minutes . How much rest was
required prior to this start ? 1.17 2 . Is
the crew required to contact the
train dispatcher to determine if any
track warrants , track bulletins or
other instructions must be obtained
before leaving Sunflower Yard 15.12
3 . Once the crew receives their System General Order Subdivision General Order
paperwork , in addition to reviewing
train paperwork , what other items
must be reviewed as part of the
initial job briefing ? 70.3 , SSI Item 7
-A
Questions and Correct Detailed Answers
(Verified Answers) 2026/27 | Graded A+
Save
Terms in this set (42)
A crew is called on duty at 10 hours and minute for minute over 12 hours
Sunflower Yard ( Orange
subdivision ) at 0600 hours for Pool
Freight HOS relief . A contract
vehicle will transport the crew to
Tucson siding ( Fiesta subdivision )
where they will add a locomotive to
the lead consist of a distributed
power train that was previously
secured on the siding track and
then operate the train southward to
Corvallis , stopping at Los Angeles
for an enroute work event .
1 . On the engineer's previous start ,
the total trip time was 11 hours and
15 minutes . How much rest was
required prior to this start ? 1.17
, A crew is called on duty at Yes
Sunflower Yard ( Orange
subdivision ) at 0600 hours for Pool
Freight HOS relief . A contract
vehicle will transport the crew to
Tucson siding ( Fiesta subdivision )
where they will add a locomotive to
the lead consist of a distributed
power train that was previously
secured on the siding track and
then operate the train southward to
Corvallis , stopping at Los Angeles
for an enroute work event . 1 . On
the engineer's previous start , the
total trip time was 11 hours and 15
minutes . How much rest was
required prior to this start ? 1.17 2 . Is
the crew required to contact the
train dispatcher to determine if any
track warrants , track bulletins or
other instructions must be obtained
before leaving Sunflower Yard 15.12
3 . Once the crew receives their System General Order Subdivision General Order
paperwork , in addition to reviewing
train paperwork , what other items
must be reviewed as part of the
initial job briefing ? 70.3 , SSI Item 7
-A