Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 56 pages
Exam (elaborations)

NEWEST CERTIFIED ENVIRONMENTAL AUDITOR EXAM OFFERED BY THE NATIONAL REGISTRY OF ENVIRONMENTAL PROFESSIONALS | COMPLETE EXAM Q&A WITH RATIONALES

Document preview thumbnail
Preview 4 out of 56 pages

NEWEST CERTIFIED ENVIRONMENTAL AUDITOR EXAM OFFERED BY THE NATIONAL REGISTRY OF ENVIRONMENTAL PROFESSIONALS | COMPLETE EXAM Q&A WITH RATIONALES

Content preview

NEWEST CERTIFIED ENVIRONMENTAL
AUDITOR EXAM OFFERED BY THE NATIONAL
REGISTRY OF ENVIRONMENTAL
PROFESSIONALS | COMPLETE EXAM Q&A
WITH RATIONALES


1. An environmental auditor is conducting a Phase I
Environmental Site Assessment (ESA) for a property.
What is the primary purpose of a Phase I ESA?
A) To collect soil and groundwater samples for
laboratory analysis
B) To identify recognized environmental conditions
(RECs) through historical review, site
reconnaissance, and regulatory records
C) To remediate contaminated soil
D) To assess indoor air quality
Correct answer: B
Rationale: A Phase I ESA (ASTM E1527) identifies
RECs. Phase II involves sampling. Remediation is
Phase III.


2. A facility has a RCRA permit for hazardous waste
treatment, storage, and disposal (TSD). During an
audit, the auditor notes that the facility has not

,conducted a required waste minimization
certification. Which of the following is required for a
generator that sends waste off-site for treatment?
A) A signed certification that the generator has a
waste minimization program in place
B) A formal EPA-approved waste minimization plan
C) A zero-discharge permit
D) A toxic reduction audit
Correct answer: A
Rationale: RCRA requires large quantity generators
(LQG) and small quantity generators (SQG) to certify
that they have a waste minimization program.


3. A facility stores hazardous waste in a satellite
accumulation area (SAA). What is the maximum
amount of hazardous waste that can be stored in an
SAA without a permit?
A) 55 gallons of non-acute hazardous waste, or 1
quart of acute hazardous waste
B) 200 gallons
C) 500 gallons
D) 1,000 gallons
Correct answer: A

,Rationale: RCRA allows 55 gallons of non-acute
hazardous waste (or 1 quart of acute) in an SAA
located at or near the point of generation.


4. An auditor is reviewing a facility's air emission
permits. Which of the following is regulated under the
Clean Air Act (CAA) as a criteria air pollutant?
A) Lead (Pb)
B) Carbon dioxide (CO2)
C) Methane (CH4)
D) Mercury (Hg)
Correct answer: A
Rationale: Criteria pollutants are: CO, O3, NO2, SO2,
PM10/PM2.5, and Pb. CO2 is not a criteria pollutant
(but is regulated under other programs).


5. A manufacturing facility discharges process
wastewater to a municipal sewer system. Which
federal law regulates this discharge?
A) Clean Water Act (CWA) – NPDES permit (direct
discharge)
B) Clean Water Act – Pretreatment Program (indirect
discharge)
C) Safe Drinking Water Act (SDWA)

, D) Resource Conservation and Recovery Act (RCRA)
Correct answer: B
Rationale: Discharges to a municipal sewer are
indirect and regulated under the National
Pretreatment Program (40 CFR 403), not NPDES
(which covers direct discharges to surface water).


6. A facility generates 1,500 kg of hazardous waste
per month. Under RCRA, how is this facility
classified?
A) Conditionally exempt small quantity generator
(CESQG)
B) Small quantity generator (SQG)
C) Large quantity generator (LQG)
D) Not regulated
Correct answer: C
Rationale: LQG = ≥1,000 kg/month. SQG = 100-1,000
kg/month. CESQG = <100 kg/month.


7. An auditor is evaluating a facility's stormwater
discharge. Which of the following is required under
the Clean Water Act for industrial facilities?
A) National Pollutant Discharge Elimination System
(NPDES) permit

Document information

Uploaded on
June 6, 2026
Number of pages
56
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$22.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
IsaacRobie
4.0
(78)
Sold
341
Followers
156
Items
4368
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions