Name types of NAMDP reports used here at I-LEVEL. - Correct Answer ✔️✔
️HMR, PQDR, TPDR, EI, BTR, 700 Div CODR.
What is HMR - Correct Answer ✔️✔️Hazardous Material Report. Must be
CAT I submitted within 24hrs in JDRS with as an EI with HMR intent.
What is PQDR? - Correct Answer ✔️✔️Product quality deficiency report.
Cat I is submitted with in 24 hrs of discovery. Cat II is submitted within three
calendar days of discovery.
What is TPDR? - Correct Answer ✔️✔️Technical publication deficiency
report. Cat I is submitted within 24 hrs. Cat II is a loss of less than 8 hours. Cat III is
a loss of more than 8 hours and CAT 4 is for misspelling or typos.
What is an EI? - Correct Answer ✔️✔️Engineering investigation. Submit a
cat I within 24 hrs of discovery. Submit a cat II EI within 5 days of discovery.
What is a BTR NAMDRP report? - Correct Answer ✔️✔️Baseline Trouble
Reports - NALCOMIS / OOMA Trouble Call. Usually submitted by AZs.
, How many categories of DRs are there? - Correct Answer ✔️✔️2. CAT-1
(safety) and CAT-2 (non-safety)
How are deficiency reports logged? - Correct Answer ✔️✔️JDRS joint
discrepancy reporting system
Explain the routing process for routing a discrepancy report - Correct Answer ✔
️✔️Report drafted by work center and routed through division to the MMCO,
returned to
(QA) for screening and routed through MO for submission.
LCP's (where are they located, why do we use them)? - Correct Answer ✔️✔
️Share point, to better a process based on command specific requirements
without taking from the NAMP.
Green MAF's (Explain NALCOMIS contingency) - Correct Answer ✔️✔
️When NALCOMIS is down, utilize the BMT and Appendix E to fill in Green MAF
blocks.
What is required along with a CD signature on a Green MAF? - Correct Answer
✔️✔️A CDI stamp