ACI Concrete Field Testing Technician Exam |
Questions with 100% Correct Answers | Verified |
Latest Update 2026/2027
Save
Practice questions for this set
Learn 1 /7 Study using Learn
true
Choose an answer
collecting a representative sample of concrete to be tested is as important as
1
executing the test methods to obtain ___________?
Is it necessary to tap the sides of the measuring bowl after each layer has been rodded
2
true or false?
When the concrete contains aggregate layer than that permitted for a particular test
3
method, the sample of concrete must be ____________ before making the test.
Start test for slump temperature in air contact within______ after obtaining the final
4
portion of the composite sample.
, Don't know?
Terms in this set (109)
collecting a representative sample of Accurate results
concrete to be tested is as important
as executing the test methods to
obtain ___________?
This practice Cover sampling from Stationary mixers, paving mixers, revolving truck
four types of equipment which are? mixers, continuous mixers
The elapsed time between obtain 15 min
the first and final portions of
composite sample shall not exceed?
Portions of composite sample shall True
be thoroughly or remix before
beginning to Test on the sample, true
or false
Start test for slump temperature in air 5 min
contact within______ after obtaining the
final portion of the composite
sample.
Start molding specimens for 15 min
strengths within_____ after fabricating
the composite sample
The concrete sample must be Evapoation
protected from contamination and?
Questions with 100% Correct Answers | Verified |
Latest Update 2026/2027
Save
Practice questions for this set
Learn 1 /7 Study using Learn
true
Choose an answer
collecting a representative sample of concrete to be tested is as important as
1
executing the test methods to obtain ___________?
Is it necessary to tap the sides of the measuring bowl after each layer has been rodded
2
true or false?
When the concrete contains aggregate layer than that permitted for a particular test
3
method, the sample of concrete must be ____________ before making the test.
Start test for slump temperature in air contact within______ after obtaining the final
4
portion of the composite sample.
, Don't know?
Terms in this set (109)
collecting a representative sample of Accurate results
concrete to be tested is as important
as executing the test methods to
obtain ___________?
This practice Cover sampling from Stationary mixers, paving mixers, revolving truck
four types of equipment which are? mixers, continuous mixers
The elapsed time between obtain 15 min
the first and final portions of
composite sample shall not exceed?
Portions of composite sample shall True
be thoroughly or remix before
beginning to Test on the sample, true
or false
Start test for slump temperature in air 5 min
contact within______ after obtaining the
final portion of the composite
sample.
Start molding specimens for 15 min
strengths within_____ after fabricating
the composite sample
The concrete sample must be Evapoation
protected from contamination and?