Heavy Equipment Operator – Career Guide, Skills & Equipment Operations
Overview
If the foundation drawing for a project says the finished elevation is 789.8 feet, while the site
plan says it is 798.8 feet, the operator should... - ANS ✔✔Ask the supervisor if the plans are the
most current.
The profile sheet for a highway construction job can provide a good idea of... - ANS ✔✔The
number of cuts and amount of fill needed on the job.
The topographical features of a building construction project, such as trees, streams, and
contours, are found on the... - ANS ✔✔Site plan.
The site plans for a building construction project provide information about the... - ANS
✔✔Finished floor elevation.
Construction drawings and specifications... - ANS ✔✔Provide detailed instructions about a
project and are a part of the contract.
A supervisor directs an operator to locate sewage pipes in a different location from that shown
on the drawing because the owner decided to keep a tree that was scheduled to be cut down.
What action should the operator take? - ANS ✔✔Do the work, but mark the change on the as
built drawing set.
Property boundary lines are established by... - ANS ✔✔A licensed surveyor.
The abbreviation CP on a site plan stands for... - ANS ✔✔Corner point.
Contour lines on a site drawing show... - ANS ✔✔Elevation levels.
Overview
If the foundation drawing for a project says the finished elevation is 789.8 feet, while the site
plan says it is 798.8 feet, the operator should... - ANS ✔✔Ask the supervisor if the plans are the
most current.
The profile sheet for a highway construction job can provide a good idea of... - ANS ✔✔The
number of cuts and amount of fill needed on the job.
The topographical features of a building construction project, such as trees, streams, and
contours, are found on the... - ANS ✔✔Site plan.
The site plans for a building construction project provide information about the... - ANS
✔✔Finished floor elevation.
Construction drawings and specifications... - ANS ✔✔Provide detailed instructions about a
project and are a part of the contract.
A supervisor directs an operator to locate sewage pipes in a different location from that shown
on the drawing because the owner decided to keep a tree that was scheduled to be cut down.
What action should the operator take? - ANS ✔✔Do the work, but mark the change on the as
built drawing set.
Property boundary lines are established by... - ANS ✔✔A licensed surveyor.
The abbreviation CP on a site plan stands for... - ANS ✔✔Corner point.
Contour lines on a site drawing show... - ANS ✔✔Elevation levels.