C-10 Electrical Part 1 UPDATED ACTUAL QUESTIONS AND CORRECT ANSWERS
1. Takeoffs of conduit are categorized into ______. Power distribution, branch lighting, and branch power
, 2. Raceways are taken off per _____. Fittings required to Linear foot, each
make turns and extensions are taking off per _.
3. All wires and conductors are taken off per _____. Linear foot
4. All fittings, devices and boxes are taken off per _____. Each Item
5. Permits and fees for tie-ins may be listed at lump sum Occurrence,Project, and Contract
and are taken off per _.
6. Control stations are taken off by _______. Individual Unit and Each Item.
7. Panelboards are taken off individually according to Type, Size, and Voltage
______.
8. Starters, safety switches and fuses are taken off per Each Item
_______.
9. _______ should be kept separate from general light Exit Lighting
fixtures.
10. Interior and exterior lighting should be taken off and Separately
listed ____ _.
11. Lamps for light fixtures are _______. Taken off per each Item
12. Light fixtures should be listed in the takeoff according Color
to ____ _.
13. Working electrical drawings numbered sequentially, Telecommunications and security systems only
prefaced by the letter "E", include __ _.
14. The _______ shows power requirements of the structure. Power plan
15. The _______ aids the electrical contractor sizing the Panel Schedule
panel.
16. The _______ plan is supplemented by the fixture Lighting
schedule.
17. The fixture schedule lists lamp _______. Wattage
18. Electrical specifications provide _______. The grade of materials to be used, Materials installation specifics, and how
materials will be used in the finished system
19. _______ must be maintained by the electrical contractor As-built drawings
for all installed work.
20. No conductors are smaller than No. _______ wire. 12
1. Takeoffs of conduit are categorized into ______. Power distribution, branch lighting, and branch power
, 2. Raceways are taken off per _____. Fittings required to Linear foot, each
make turns and extensions are taking off per _.
3. All wires and conductors are taken off per _____. Linear foot
4. All fittings, devices and boxes are taken off per _____. Each Item
5. Permits and fees for tie-ins may be listed at lump sum Occurrence,Project, and Contract
and are taken off per _.
6. Control stations are taken off by _______. Individual Unit and Each Item.
7. Panelboards are taken off individually according to Type, Size, and Voltage
______.
8. Starters, safety switches and fuses are taken off per Each Item
_______.
9. _______ should be kept separate from general light Exit Lighting
fixtures.
10. Interior and exterior lighting should be taken off and Separately
listed ____ _.
11. Lamps for light fixtures are _______. Taken off per each Item
12. Light fixtures should be listed in the takeoff according Color
to ____ _.
13. Working electrical drawings numbered sequentially, Telecommunications and security systems only
prefaced by the letter "E", include __ _.
14. The _______ shows power requirements of the structure. Power plan
15. The _______ aids the electrical contractor sizing the Panel Schedule
panel.
16. The _______ plan is supplemented by the fixture Lighting
schedule.
17. The fixture schedule lists lamp _______. Wattage
18. Electrical specifications provide _______. The grade of materials to be used, Materials installation specifics, and how
materials will be used in the finished system
19. _______ must be maintained by the electrical contractor As-built drawings
for all installed work.
20. No conductors are smaller than No. _______ wire. 12