Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 6 pages
Exam (elaborations)

Planning and Estimating UPDATED ACTUAL QUESTIONS AND CORRECT ANSWERS

Document preview thumbnail
Preview 2 out of 6 pages

Planning and Estimating UPDATED ACTUAL QUESTIONS AND CORRECT ANSWERS

Content preview

Planning and Estimating UPDATED ACTUAL QUESTIONS AND CORRECT
ANSWERS

The components of an assembly may be limited to a True
single trade or may be installed by many different trades.


The assembly and square-foot methods are typically False
used for preparing detailed estimates.

, When preparing a conceptual estimate, typically there True
are no drawings available or they drawings are very
limited and the contractor makes assumptions about
virtually every aspect of the project.


Project comparison estimates are prepared by True
comparing the cost of a proposed project to a
completed project.


Which of the following provides the bidders with the Instructions to bidders
procedures that must be followed to submit a complete
bid.


A detailed estimate includes determination of the all are included
quantities and costs of everything required to complete
the project including:


Which of the following modifies the basic contract Addendum
documents after they have been issued to the bidder, but
prior to the taking of bids.


To be able to do quantity takeoff, the estimator must: All are required


The assembly method involves computing the square False
footage of the building and multiplying that area by a
cost per square foot.


An estimator should be able to look at the drawings to True
visualize the project through its various phases of
construction.


In construction estimating, bonds refer to: Written documents that guarantee that the contract documents will be complied
with and all costs relative to the project will be paid


In a contract, it is best to express the time of completion false
as the number of working days rather than the number of
calendar days.


In a lump-sum agreement, the contractor agrees to true
construct the project in accordance with the contract
documents, for a set price arrived at through competitive
bidding or negotiation.


Contracts may be awarded either by separate contracts true
for the various phases required for the completion of the
project or by a single contract for the entire project.


In a cost-plus-fee agreement, the fee is always a false
specified percent of the construction costs.

Document information

Uploaded on
May 29, 2026
Number of pages
6
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Briwisescore
3.0
(1)
Sold
25
Followers
5
Items
11419
Last sold
6 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions