LARE - PRACTICE EXAM B SHAKE AND BAKE

Content preview

LARE - PRACTICE EXAM B/ SHAKE AND BAKE


Purpose of a Charrette - Answers - -Provide feeback from multiple sources over the
course of several days
-Allow community input into the design process
-Cultivate a relationship with specific stakeholders

Time extensions are granted when.. - Answers - The owner increases the scope of work
to be completed

Schedule status of a project? - Answers - Calculate the amount of work completed and
compare it to the total work to be completed for the current project phase

Gantt Chart - Answers - Best used for small to medium size project with a limited
number of deadlines, deliverables, and subconsultants.

Who drafts as-built drawings? - Answers - Contractor

Milestone List - Answers - -Most simple, straightforward, and concise way of conveying
basic project schedule information
-Most often used by clients in RFPs

Certificate of Title - Answers - A document used to provide proof of ownership of a
property

Typical face value of a bid bond? - Answers - Typically set at 5% of the contract
amount. Can range from 5-20% of the contract amount.

Purpose of Punch List - Answers - Document minor deficiencies in the construction
project after substantial completion.

Design Specifications - Answers - Address issues of workmanship, methods and
materials

Performance Specification - Answers - Address the technical performance of a finished
product without addressing the information covered in a design specification

Notice of Substantial Completion - Answers - -The owner can no longer assess
liquidated damages for late completion
-The owner can only withhold the costs of repairing or completing punch list items from
the contractor
-The property is considered suitable for occupancy or use for its intended purpose

, Project Managers and Risk? - Answers - Project managers must minimize risk and
manage it whenever it occurs

Acceleration - Answers - Occurs when the contractor must hire additional workers, work
overtime, or incur costs to meet a deadline.

Excusable Delays - Answers - Acts of God, emergencies, and labor strikes

Unit Price Contract - Answers - Establish pricing for a unit of work or materials and fees
are modified based on the number of units required in a project. Unit prices can
incorporate any and all anticipated costs associated with the installation of the unit,
including labor, overhead, profit and materials.

Cost-Plus Contract - Answers - Allow for reimbursement of construction expenses plus
a predetermined fee (usually calculated as a percentage) for overhead and profit.

Lump Sum Contract - Answers - Require the contractor to complete a scope of work for
a mutually agreed upon fixed sum of money.

Why should LAs not provide direct guidance to contractor's workers? - Answers - -The
LA could be held liable for any impacts to the construction schedule.
-General Rule: If a question arises on a construction site, the contractor should issue an
RFI and allow the LA to respond via the procedures outlines during the consturction
kickoff meeting.

Time Contingency - Answers - Implies that the timeline for the task was intentionally
overestimated to account for overruns in the schedule.

Retaianage - Answers - Withheld from payments to the contractor and then released
back to the contractor at or near project completion. While a contractor may receive less
money initially due to retainage, the overall contract value or total amount of money paid
to the contractor is not affected by retainage.

5 Phases of a Project - Answers - (According to Ramroth)
Start, Planning, Design, Production, and Closeout

Architect's Supplemental Instruction Form - Answers - Can be used to correct errors or
inconsistencies in a contract between the owner/client and the contractor after said
contract has been signed.

CSI Divisions: 1, 2, 3, and 9 - Answers - D1 - General Requirements
D2 - Sitework
D3 - Concrete
D9 - Finishes

Milestones for CD Set - Answers - 0%, 25%, 50%, 90%, 100%

Document information

Uploaded on
May 28, 2026
Number of pages
7
Written in
2025/2026
Type
Other
Person
Unknown
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA
3.8
(367)
Sold
2191
Followers
1449
Items
61657
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions