CEPSCI PRACTICE TEST Q’s and A’s

Content preview

CEPSCI PRACTICE TEST Q’s and A’s
1972 clean water act - ✔◻✔◻Administered by the US environmental protection agency (EPA) Created
the NPDES



1987 - ✔◻✔◻Amendment to CWA CALLED WATER QUALITY ACT



NPDES in south carolina - ✔◻✔◻South Carolina is NPDES delegated state.



NPDES regulations are administered by - ✔◻✔◻SCDHEC



CGP authorizes - ✔◻✔◻stormwater discharges from construction sites



Who must obtain NPDES coverage - ✔◻✔◻land disturbing activities greater than or equal to 1 acre

-land disturbance less than 1 ac within 1/2 miles of water body in SC costal zone



NPDES permits are issued to - ✔◻✔◻operator-person or company for a particular discharge



primary permittee - ✔◻✔◻-has day to day operational control to ensure compliance with SWPP

-typically the owner or developer



primary permittee responsibilites - ✔◻✔◻submit NOI, Preparation of the C_SWPPP



Secondary permittee - ✔◻✔◻individual lot owner or residential builder that conducts land disturbing
activity limited to an individual lot or group of lots as part of approved LCP of development

,contractors - ✔◻✔◻must on Contractor Certification- D-0437



On-Site SWPPP - ✔◻✔◻SCDHEC CGP, NOI, NPDES coverage approval letter, Contractor Certifications,
Local Approvals, USACE approvals, Critical area permit(coast)



OS_SWPPP - ✔◻✔◻a copy of signed and certified SWPPP, NOI, and CGP coverage letter from DHEC
must be retained at site or electronically accessible



minor modification to ON-SWPPP - ✔◻✔◻minor modifications made directly in the field,do not need
approval by DHEC- additional BMP's, removal of disturbed areas



major modifications to OS-SWPPP - ✔◻✔◻must be made by qualified individual and submitted to
DHEC or appropriate delegated entity for approval



Phased plan requirement > 5 - ✔◻✔◻include a phased stormwater management plan which identifies
all BMP's and grading work conducted during a specific portion of the sites construction sequence. Each
phase identified on at least one separate plan sheet.



Phased plan requirement < 10 but > 5 acres - ✔◻✔◻at least two separate plan phases are required -
initial land disturbance phase - stabilization phase



Phased plan requirement ≥ 10 acres - ✔◻✔◻at least 3 separate plan phases are required - initial land
disturbance phase - construction phase - stabilization phase



All compliance inspection must include invesg. of, at a minimum of 5 of the following - ✔◻✔◻1. areas
of site disturbed by construction activity and areas used for storage of materials exposed to
precipitation

2. stormwater conveyance systems for evidence of sediment

3. BMP's identified in OS-SWPPP

, 4. Discharge location to investigate if sediment leaving site, or if such locations are inaccessible, nearby d
X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2




ownstream location if possible. X2 X2 X2




5. Where vehicles enter or exit site for evidence of off-site sediment tracking.
X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2




inspection frequency after construction begins -
X2 X2 X2 X2 X2




✔◻✔◻at least once a week or within 24 hours of end of storm event >0.5 inches
X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2




Inspection frequency for sites that have reached temporary stablization - ✔◻✔◻Once every month
X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2




Linear site inspection -
X2 X2 X2




✔◻✔◻linear activites may limit access to disturbed areas, in such cases representative inspections may
X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2




be performed
X2




representative inspections (linear site inspection) - X2 X2 X2 X2 X2




✔◻✔◻personnel must investigate BMP's along the site for 0.25 miles above and below each access poi
X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2




nt where the site intersects with -roadway - undisturbed right of way - other similar feature-
X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2




Condition along each inspected segment are considered "respresentative" along that reach of constructio
X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2




n



permittees must record rainfall events of - ✔◻✔◻0.5 inches or greater
X2 X2 X2 X2 X2 X2 X2 X2 X2 X2




where should rainfall records be kept - ✔◻✔◻maintained in rain log located as part of the OS-SWPPP
X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2




Inspection reports of rainfall must be -
X2 X2 X2 X2 X2 X2




✔◻✔◻reported on each weekly inspection report and maintained in rain log
X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2




For each compliance inspecton a report must be completed and include at a mininum -
X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2 X2




✔◻✔◻1. Inspection date
X2 X2 X2




2. Name, title, qualification of inspector
X2 X2 X2 X2




3. Weather information for period since last inspection
X2 X2 X2 X2 X2 X2

Document information

Uploaded on
May 22, 2026
Number of pages
17
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EliteStudyHub
2.0
(11)
Sold
103
Followers
6
Items
10073
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions