• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 10 pages
Exam (elaborations)

Pjm Transmission 2026 Exam Test Actual Questions And Answers Sure A.pdf

Document preview thumbnail
Preview 2 out of 10 pages

PJM TRANSMISSION 2026 EXAM TEST ACTUAL QUESTIONS AND ANSWERS SURE A.pdf

Content preview

PJM TRANSMISSION 2026 EXAM TEST ACTUAL
QUESTIONS AND ANSWERS SURE A+
✔✔True or False: What data needs a fast scan data exchange rate with PJM? Area
Control Error (ACE) and Regulation Signals - ✔✔True

✔✔Where are transmission owners required to keep satellite phones? - ✔✔Primary and
backup control centers (phones tested weekly)

✔✔True or False: This type of capacity alert is issued when the estimated operating
reserve capacity is less than the forecasted synchronized requirement? Voltage
Reduction Warning - ✔✔False, Voltage Reduction Alert

✔✔When a voltage reduction is implemented, what % is voltage reduced by at
distribution levels?

1) 0 to 2.5%
2) 2.5 to 5%
3) 5 to 7.5%
4) 7.5 to 10% - ✔✔2

✔✔What type of warning is issued if available synchronized reserves are less than the
synchronized reserve requirements?

1) Voltage Reduction Warning
2) Max Generation Warning
3) Primary Reserve Warning
4) Manual load Dump Warning - ✔✔1 (Synchronized reserves can be brought on in 10
min or load dropped in 10 minutes)

✔✔Action issued to provide relief when all other possible means of supplying internal
load has been exhausted to prevent a catastrophe or to maintain tie schedules so as
not to jeopardize the reliability of other interconnected regions? - ✔✔Manual Load
Dump

✔✔True or False: A NERC Emergency Alert (EEA) Level 1 issued during which
capacity alerts? Minimum Generation Events - ✔✔False, Maximum Generation Event

✔✔An alert is issued by NOAA when a solar storm greater than what intensity is
predicted or observed?

1) K3
2) K5
3) K7

, 4) K9 (Woof Woof) - ✔✔2

✔✔What is the line charging for a 500 kV line?

1) 1.0 MVAR per mile
2) 1.3 MVAR per mile
3) 1.5 MVAR per mile
4) 1.7 MVAR per mile - ✔✔4

✔✔Heavy Load Voltage Schedule Warning has been issued for PJM RTO. TOs should
do all of the following EXCEPT:

1) Ensure capacitors are in service
2) Set AVR to manual control
3) Remove shunt reactors
4) Ensure voltage regulators are in service
5) Ensure units maintain a reasonable MVAR reserve - ✔✔2

✔✔True or False: Electrically close is defined as: Less than 100 miles @ 230 kV -
✔✔False, less than 50 miles @ 230 kV

✔✔What is Ferranti Effect? - ✔✔Increase in voltage at the end of a long transmission
line, above the voltage at the sending end. Occurs when line is energized, but there is a
very light load, or disconnected

✔✔True or False: What frequencies are used for time corrections? 59.98 & 60.02 Hz
(59.98 corrects fast time error) - ✔✔True

✔✔After a loss of telemetry, the operator must update info how often?

1) 5 minutes
2) 15 minutes
3) 30 minutes
4) 1 hour - ✔✔3

✔✔Contingency reserves must be greater than: - ✔✔Most Severe Single Contingency
(MSSC)

✔✔In addition to DOE, a report for system disturbances must be filed with NERC and
RF within ________ of incidents or disturbances. 24 Hours

1) 1 Hour
2) 6 Hours
3) 24 Hours

Document information

Uploaded on
May 20, 2026
Number of pages
10
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BOARDWALKer
3.4
(19)
Sold
160
Followers
6
Items
26749
Last sold
3 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions