Which role is responsible for identifying existing and predictable hazards and has the authority
to correct them?
A. Authorized Person
B. Competent Person
C. Qualified Person
D. Installer - ANSWER-A
A "qualified person" is best described as:
A. Anyone trained by employer
B. One who can supervise work
C. One with recognized degree/cert/experience to solve problems
D. Any foreman
Ref: OSHA 1926.32(m) - ANSWER-C
Which document is most directly used to control work steps and hazards for a specific task?
A. RF plot
B. JHA/JSA
C. Invoice
D. As-built Ref: OSHA safety planning concepts - ANSWER-B
When must a rescue plan be in place?
A. After First Climb
B. Before Work Begins
C. Only if >200ft
,D. Only if a hoist is used
Ref: ANSI Z359 (rescue) + OSHA Expectations - ANSWER-B
Which is the best order for hazard controls?
A. PPE->Engineering->Admin
B. Engineering->PPE->Elimination
C. Elimination->Substitution->Engineering->Administrative->PPE
D. Administrative->PPE->Elimination
Ref: OSHA Hazard Control Hierarchy (General Safety Doctrine) - ANSWER-C
Who must verify component compatibility in a fall arrest system?
A. Any climber
B. Qualified Person/Competent Person per Plan
C. Customer
D. Safety Observer only
Ref: ANSI Z359 Guidance + NWSA Planning Items - ANSWER-B
What's the best definition of "Fall Restraint?"
A. Stops fall after it happens
B. Prevents reaching fall hazard
C. Uses Deceleration Device
D. Requires Rescue System
Ref: ANSI Z359 Fall Protection Code - ANSWER-B
What is the primary purpose of a pre-task plan ("PTP")?
A. Billing
B. Identify Hazards + Define Controls + Roles
C. Determine RF License
,D. Choose Paint Color
Ref: ANSI/ASSP A10-Series Planning - ANSWER-B
An "Authorized Person" is typically:
A. Engineer
B. Person Approved to perform duties requiring protection
C. OSHA Inspector
D. Tower Owner
Ref: ANSI Z359 Definitions - ANSWER-B
Which is a leading indicator?
A. Recordable Rate
B. Near-Miss Reporting
C. Workers' Comp Costs
D. Fatality Count
Ref: ASSP A10 Program Concepts - ANSWER-B
A "Stop Work" Authority Should Be:
A. Limited to Management
B. Limited to Safety Director
C. Available to ALL Workers
D. Only for RF Hazards
Ref: A10 Safety Practice Expectations; NSWA Ref. Set. - ANSWER-C
When weather changes (Gusts, Lightning, etc.), the correction action is to:
A. Finish Quickly
B. Continue if behind schedule
C. Reassess Hazards and Suspend as Needed
, D. Only Notify Customer
Ref: A10.48 Safe Work Practices Concept - ANSWER-C
If a procedure conflicts with a manufacturer instruction, you should follow:
A. The cheapest option
B. The Manufacturer Instruction (unless engineered alternative approved)
C. The Newest Employee
D. None of the Above
Ref: A10.48 + ANSI Z359 Manufacturer Instructions Emphasis - ANSWER-B
What is the purpose of a tailored(tailgate)/"toolbox" talk?
A. Payroll
B. Verify Hazards, Controls & Task Sequencing
C. RF Exposure Mapping
D. FAA Notice Filing
REF: A10 Safety Practice Expectations - ANSWER-B
Which is most likely a "Critical Lift?"
A. Hand-Carry Tools
B. Hoisting a large antenna over active antenna lines
C. Climbing 20 ft
D. Sweeping Coax
Ref: A10.48 Rigging/Hoisting Planning Concepts + B30 Series Awareness - ANSWER-B
A crew member reports damaged gear. The correct action to take is:
A. Tape it
B. Remove it from service pending evaluation
C. Use only at low height
(VeRiFied) | LATeST uPdATe 2026/2027 | GRAded A+ | BRANd NeW |
100% GuARANTeed PASS
Which role is responsible for identifying existing and predictable hazards and has the authority
to correct them?
A. Authorized Person
B. Competent Person
C. Qualified Person
D. Installer - ANSWER-A
A "qualified person" is best described as:
A. Anyone trained by employer
B. One who can supervise work
C. One with recognized degree/cert/experience to solve problems
D. Any foreman
Ref: OSHA 1926.32(m) - ANSWER-C
Which document is most directly used to control work steps and hazards for a specific task?
A. RF plot
B. JHA/JSA
C. Invoice
D. As-built Ref: OSHA safety planning concepts - ANSWER-B
When must a rescue plan be in place?
A. After First Climb
B. Before Work Begins
C. Only if >200ft
,D. Only if a hoist is used
Ref: ANSI Z359 (rescue) + OSHA Expectations - ANSWER-B
Which is the best order for hazard controls?
A. PPE->Engineering->Admin
B. Engineering->PPE->Elimination
C. Elimination->Substitution->Engineering->Administrative->PPE
D. Administrative->PPE->Elimination
Ref: OSHA Hazard Control Hierarchy (General Safety Doctrine) - ANSWER-C
Who must verify component compatibility in a fall arrest system?
A. Any climber
B. Qualified Person/Competent Person per Plan
C. Customer
D. Safety Observer only
Ref: ANSI Z359 Guidance + NWSA Planning Items - ANSWER-B
What's the best definition of "Fall Restraint?"
A. Stops fall after it happens
B. Prevents reaching fall hazard
C. Uses Deceleration Device
D. Requires Rescue System
Ref: ANSI Z359 Fall Protection Code - ANSWER-B
What is the primary purpose of a pre-task plan ("PTP")?
A. Billing
B. Identify Hazards + Define Controls + Roles
C. Determine RF License
,D. Choose Paint Color
Ref: ANSI/ASSP A10-Series Planning - ANSWER-B
An "Authorized Person" is typically:
A. Engineer
B. Person Approved to perform duties requiring protection
C. OSHA Inspector
D. Tower Owner
Ref: ANSI Z359 Definitions - ANSWER-B
Which is a leading indicator?
A. Recordable Rate
B. Near-Miss Reporting
C. Workers' Comp Costs
D. Fatality Count
Ref: ASSP A10 Program Concepts - ANSWER-B
A "Stop Work" Authority Should Be:
A. Limited to Management
B. Limited to Safety Director
C. Available to ALL Workers
D. Only for RF Hazards
Ref: A10 Safety Practice Expectations; NSWA Ref. Set. - ANSWER-C
When weather changes (Gusts, Lightning, etc.), the correction action is to:
A. Finish Quickly
B. Continue if behind schedule
C. Reassess Hazards and Suspend as Needed
, D. Only Notify Customer
Ref: A10.48 Safe Work Practices Concept - ANSWER-C
If a procedure conflicts with a manufacturer instruction, you should follow:
A. The cheapest option
B. The Manufacturer Instruction (unless engineered alternative approved)
C. The Newest Employee
D. None of the Above
Ref: A10.48 + ANSI Z359 Manufacturer Instructions Emphasis - ANSWER-B
What is the purpose of a tailored(tailgate)/"toolbox" talk?
A. Payroll
B. Verify Hazards, Controls & Task Sequencing
C. RF Exposure Mapping
D. FAA Notice Filing
REF: A10 Safety Practice Expectations - ANSWER-B
Which is most likely a "Critical Lift?"
A. Hand-Carry Tools
B. Hoisting a large antenna over active antenna lines
C. Climbing 20 ft
D. Sweeping Coax
Ref: A10.48 Rigging/Hoisting Planning Concepts + B30 Series Awareness - ANSWER-B
A crew member reports damaged gear. The correct action to take is:
A. Tape it
B. Remove it from service pending evaluation
C. Use only at low height