1|Page
CCT-CCI (Certified Perioperative Nurse) EXAM
ACTUAL EXAM 2026/2027 | ALL QUESTIONS AND
CORRECT ANSWERS (VERIFIED ANSWERS) |
GRADED A+ | LATEST EXAM | JUST RELEASED
What is a basic element of work or a task that must be performed over
a given period of time in order to
complete a project called?
A. WBS element
B. Activity
C. Resource
D. Commodity ......ANSWER......Answer: B
A concrete slab measuring 10 feet wide by 13.5 feet long by 6 inches
deep is to be installed. How many cubic
yards of concrete will be required?
A. 3.0 cubic yards
B. 2.0 cubic yards
C. 3.5 cubic yards
D. 2.5 cubic yards ......ANSWER......Answer: D
pg. 1
,2|Page
A systematic coding structure for organizing and managing scope,
assets, cost, resources, work and schedule
activity information is a______________.
A. Cost breakdown structure
B. Code of accounts
C. Cost estimate classification
D. Schedule identification number ......ANSWER......Answer: B
Which of the following best describes the concept of total cost
management:
A. A method of quantifying construction damages where the total job
costs are subtracted from the original bid
or estimate to determine the total cost amount for a claim
B. The practices and processes utilized to manage the total life cycle
cost investment in a portfolio of strategic
assets
C. A job cost system for ensuring all aspects of a particular
manufacturing process are accumulated completely
D. An integrating process that maps the fields of practice of cost
engineering without linking it to project
management, resource management, or accounting
......ANSWER......Answer: D
pg. 2
,3|Page
AACE International defines _____________as a technique of economic
evaluation that sums over a given study
period, the costs of initial investment, replacements, operations, and
maintenance/repair; expressed in either
present or annual value terms.
A. Risk analysis
B. Benefit/Cost ratio (B/C) method
C. Net present worth method
D. Life cycle costs method (LCC) ......ANSWER......Answer: D
______________can be defined as the determination of that course of
action or combination of alternatives that
yields either the lowest cost or the highest profit.
A. Economic optimization
B. Simulation
C. Linear programming
D. Dynamic programming ......ANSWER......Answer: D
A bond that guarantees the bidder will enter into a contract on the
basis of his/her bid is referred to as:
pg. 3
, 4|Page
A. Surety bond
B. Performance bond
C. Bid bond
D. Liability bond ......ANSWER......Answer: C
An effort by a prime contractor to reduce the price quoted by a vendor,
by providing the bid price to other
vendors in an attempt to get the other vendors to underbid the original
price quoted is referred to as:
A. Costing
B. Cost-price analysis
C. Bid shopping
D. Negotiating a best and final offer ......ANSWER......Answer: C
What is executed in connection with a contract and secures the
performance and fulfillment of all the
undertakings, covenants, terms, conditions and agreements contained
in the contract?
A. Liability insurance
B. Performance bond
pg. 4
CCT-CCI (Certified Perioperative Nurse) EXAM
ACTUAL EXAM 2026/2027 | ALL QUESTIONS AND
CORRECT ANSWERS (VERIFIED ANSWERS) |
GRADED A+ | LATEST EXAM | JUST RELEASED
What is a basic element of work or a task that must be performed over
a given period of time in order to
complete a project called?
A. WBS element
B. Activity
C. Resource
D. Commodity ......ANSWER......Answer: B
A concrete slab measuring 10 feet wide by 13.5 feet long by 6 inches
deep is to be installed. How many cubic
yards of concrete will be required?
A. 3.0 cubic yards
B. 2.0 cubic yards
C. 3.5 cubic yards
D. 2.5 cubic yards ......ANSWER......Answer: D
pg. 1
,2|Page
A systematic coding structure for organizing and managing scope,
assets, cost, resources, work and schedule
activity information is a______________.
A. Cost breakdown structure
B. Code of accounts
C. Cost estimate classification
D. Schedule identification number ......ANSWER......Answer: B
Which of the following best describes the concept of total cost
management:
A. A method of quantifying construction damages where the total job
costs are subtracted from the original bid
or estimate to determine the total cost amount for a claim
B. The practices and processes utilized to manage the total life cycle
cost investment in a portfolio of strategic
assets
C. A job cost system for ensuring all aspects of a particular
manufacturing process are accumulated completely
D. An integrating process that maps the fields of practice of cost
engineering without linking it to project
management, resource management, or accounting
......ANSWER......Answer: D
pg. 2
,3|Page
AACE International defines _____________as a technique of economic
evaluation that sums over a given study
period, the costs of initial investment, replacements, operations, and
maintenance/repair; expressed in either
present or annual value terms.
A. Risk analysis
B. Benefit/Cost ratio (B/C) method
C. Net present worth method
D. Life cycle costs method (LCC) ......ANSWER......Answer: D
______________can be defined as the determination of that course of
action or combination of alternatives that
yields either the lowest cost or the highest profit.
A. Economic optimization
B. Simulation
C. Linear programming
D. Dynamic programming ......ANSWER......Answer: D
A bond that guarantees the bidder will enter into a contract on the
basis of his/her bid is referred to as:
pg. 3
, 4|Page
A. Surety bond
B. Performance bond
C. Bid bond
D. Liability bond ......ANSWER......Answer: C
An effort by a prime contractor to reduce the price quoted by a vendor,
by providing the bid price to other
vendors in an attempt to get the other vendors to underbid the original
price quoted is referred to as:
A. Costing
B. Cost-price analysis
C. Bid shopping
D. Negotiating a best and final offer ......ANSWER......Answer: C
What is executed in connection with a contract and secures the
performance and fulfillment of all the
undertakings, covenants, terms, conditions and agreements contained
in the contract?
A. Liability insurance
B. Performance bond
pg. 4