• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 23 pages
Exam (elaborations)

NICET_LEVEL_1_HIGHWAY_CONSTRUCTION_EXAM_SCRIPT_2026_QUESTIONS_WITH

Document preview thumbnail
Preview 3 out of 23 pages

NICET_LEVEL_1_HIGHWAY_CONSTRUCTION_EXAM_SCRIPT_2026_QUESTIONS_WITH

Content preview

NICET LEVEL 1 HIGHWAY CONSTRUCTION
EXAM SCRIPT 2026 QUESTIONS WITH
ANSWERS GRADED A+

●● The contractor is installing a culvert with a 12-inch reinforced
concrete pipe ( outside diameter of 16.50 inches) from Sta 10+00, 40
feet Left to STA 10+00, 65 feet Right on 4-inch bedding material. The
12-inch RCP outlet is to be installed at Sta 10+00, 40 feet Left at an
invert elevation of 652.50.


If the conduit is installed at a 1.40% slope, what is the elevation of the
foundation grade at Sta 10+00, 45 feet Right?


a) 652.04
b) 653.17
c) 653.36
d) 653.50 Answer: ?


●● On the reservoir side of a dam, erosion protection against wave
action should extend up the slope to at least which level?


a) crest of dam
b) maximum water elevation

,c) minimum water elevation
d) two-thirds the height of the dam Answer: b) maximum water
elevation


●● During stage construction while installing drainage, the contractor
must complete which two of the following tasks? (Choose two).


a) Bulk head the pipe until the system is complete.
b) Complete the entire system before it rains.
c) Maintain the existing drainage system until the new system is
functional.
d) Provide temporary connections as needed to maintain the existing
system. Answer: c) Maintain the existing drainage system until the new
system is functional.
d) Provide temporary connections as needed to maintain the existing
system.


●● After flushing but before connecting a new main to the existing
system, what test does an inspector need to verify before placing the
main into service?


a) bacteriological testing
b) cover testing
c) deflection testing

, d) pressure testing Answer: d) pressure testing


●● Which three types of inspections are completed for sign structures?
(Choose three).


a) final inspection
b) interim inspection
c) initial inspection
d) routine inspection Answer: b) interim inspection
c) initial inspection
d) routine inspection


●● How many times per foot should loop lead-in wires be twisted?


a) 3 turns per foot
b) 5 turns per foot
c) 6 turns per foot
d) 7 turns per foot Answer: b) 5 turns per foot


●● Which phrase is true of test reports required for concrete sidewalks,
asphalt pavement, concrete curb, and pipe culverts for rest areas?


a) 50% required on roadway contracts

Document information

Uploaded on
May 15, 2026
Number of pages
23
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sold
36
Followers
1
Items
14305
Last sold
5 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions