Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 6 pages
Exam (elaborations)

OPMA 3306 FINAL EXAM REVIEW QUESTIONS AND ANSWERS

Document preview thumbnail
Preview 2 out of 6 pages

OPMA 3306 FINAL EXAM REVIEW QUESTIONS AND ANSWERS

Content preview

OPMA 3306 FINAL EXAM REVIEW
QUESTIONS AND ANSWERS

A BOM file is also called which of the following - Correct Answers -Product Tree

MRP stands for Material Requirements Planning - Correct Answers -True

A project can be subdivided into which of the following - Correct Answers -work
packages

MRP is most valuable where a number of products are made in batches using the same
productive equipment - Correct Answers -True

PERT is an abbreviation for which of the following methodologies - Correct Answers -
Program Evaluation and Review Technique

How many free trade zones are there in the US - Correct Answers -about 260

A master production schedule is an input to a material requirements planning (MRP)
system - Correct Answers -True

An input to the material requirements planning (MRP) system is an exception report -
Correct Answers -False

Which of the following are eligible companies to be considered for the Baldrige award -
Correct Answers -auditing firms

An input to the material requirements planning (MRP) system is an inventory records file
- Correct Answers -True

MRP systems seek to achieve - Correct Answers -determine the number of dependent
demand items needed

A modular bill of materials includes items with fractional options - Correct Answers -
False

Which of the following is considered a primary report in an MRP system - Correct
Answers -Planned order schedules

Which of the following can be used or lot sizing in an MRP system - Correct Answers -
least unit cost

, The acronym ERP stands for - Correct Answers -Enterprise Resource Planning

Freezing the master schedule is - Correct Answers -done to avoid the chaos of
expediting and resultant overdue orders

An analytical tool used in six-sigma quality improvement programs is which of the
following - Correct Answers -checksheets

In monitoring process quality we might use which of the following statistics - Correct
Answers -difference between the highest and lowest value in a sample

Quality of life in a host community is not a major factor in making the facility location
decision - Correct Answers -False

AQL stands for accepting questionable lots in production quality management - Correct
Answers -False

Net change MRP systems are "activity" driven - Correct Answers -True

A BOM file is also called - Correct Answers -Product Tree

Which of the following should we use an "R" chart to monitor process quality - Correct
Answers -tire pressures in an auto assembly plant

In a net change MRP system requirements and schedules are considered rigid and
never updated - Correct Answers -False

What is a work breakdown structure - Correct Answers -A definition of the hierarchy of
project tasks, subtasks, and work packages

Low level coding in MRP indicates that exact status of each item managed by the
system in "real time" - Correct Answers -False

For which of the following should we use a "p" chart to monitor process quality - Correct
Answers -Defective electrical switches

Breakthrough projects are those that provide fundamental improvements to existing
products - Correct Answers -False

A lot for lot (L4L) lost sizing technique does not take into account setup costs or
capacity limitations - Correct Answers -True

"Projected available balance" is a term referring to unsold finished goods inventory -
Correct Answers -False

Document information

Uploaded on
May 10, 2026
Number of pages
6
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
millyphilip
3.6
(555)
Sold
2955
Followers
1963
Items
45759
Last sold
18 hours ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions