Who-is-authorized-to-enforce-the-provisions-of-780-CMR,-review/issue-permit-
applications,-issue-noticed/orders,-and-make-required-inspections?---ans-✔✔Building-
official
IRC-Amendments-R104.1-General
Who-shall-receive-and-issue-permits?---ans-✔✔Building-official
IRC-Amendments-R104.2-Application-and-Permits
Who-shall-issue-notices-and-orders?---ans-✔✔Building-official
IRC-Amendments-R104.3
who-shall-make-the-required-inspections?---ans-✔✔Building-official
IRC-Amendments-R104.4
A-permit-is-required-for-work-including-but-not-limited-to-repairs-for-substantial-cutting-of-
walls---ans-✔✔IRC-Amendments-R105.2.2-Repairs
The-building-official-shall-issue-or-deny-a-permit-within-___-days-of-filing---ans-✔✔30-days
IRC-Amendments-R105.3.1-Action-on-Application
How-many-days-does-a-building-inspector-have-to-act-on-a-permit-application
a.)-180-days
b.)-90-days
c.)-30-days
d.)-60-days---ans-✔✔c.)-30-days
IRC-Amendments-R105.3.1-Action-on-Application
Every-permit-issued-shall-become-invalid-unless-the-work-authorized-by-such-permit-is-
commended-within-___-days.-The-building-official-can-grant-one-or-more-extensions-for-
periods-not-more-than-____-days---ans-✔✔180-days,-90-days
IRC-Amendments-R105.3.2-Time-Limitation-on-Application
, A-permit-may-be-suspended-or-revoked-for-all-of-the-following-reasons,-except
a.)-where-it-is-issued-in-error
b.)-on-the-basis-of-incomplete-information
c.)-where-issued-in-violation-of-jurisdictional-ordinance
d.)-where-other-permits-by-the-contractor-have-been-voided---ans-✔✔d.)-where-other-
permits-by-the-contractor-have-been-voided
IRC-Amendments-R105.6
Submittal-documents-consisting-of-construction-documents,-and-other-data-shall-be-
submitted-in-____-or-more-sets-with-each-application-for-a-permit---ans-✔✔two-sets
IRC-Amendments-R107.1-Submittal-Documents
Townhouse-buildings-greater-than-35,000-square-feet-require-a-______---ans-
✔✔registered-design-professional
IRC-Amendments-R107.1.6-Townhouse-buildings-greater-than-35,000-square-feet
On-which-drawing-will-you-find-the-building-location-and-lot-lines?---ans-✔✔Site-plan/plot-
plan
IRC-Amendments-R107.2-Site-Plan-or-Plot-Plan
Who-should-the-building-official-notify-inspections-for-on-site-construction?---ans-
✔✔permit-holder
R109.1-Type-of-inspections
What-is-required-for-a-certificate-of-occupancy
1a)-building-permit-number
b.)-assessed-value-of-the-structure
c.)-the-name-of-the-building-official
d.)-design-occupant-load---ans-✔✔b.)-assessed-value-of-the-structure
111.2-certificate-of-occupancy
A-stop-work-is-given-to-all-but-the-following
a.)-tenant-of-the-space
b.)-owner's-authorized-agent
c.)-person-performing-the-work
d.)-owner-of-the-property-involved---ans-✔✔a.)-tenant-of-the-space
R114.1
Retaining-walls-less-than-____-feet-in-height-requires-a-construction-supervisor-license---
ans-✔✔10-feet
IRC-special-regulations-table-110.R5.1-Construction-supervisor-License-(CSL)-Scope-of-
Work
A-construction-supervisor-license-is-required-for-all-but-the-following
a.)-swimming-pools
b.)-Buildings-or-structures-for-agricultural-use
QUESTIONS
Who-is-authorized-to-enforce-the-provisions-of-780-CMR,-review/issue-permit-
applications,-issue-noticed/orders,-and-make-required-inspections?---ans-✔✔Building-
official
IRC-Amendments-R104.1-General
Who-shall-receive-and-issue-permits?---ans-✔✔Building-official
IRC-Amendments-R104.2-Application-and-Permits
Who-shall-issue-notices-and-orders?---ans-✔✔Building-official
IRC-Amendments-R104.3
who-shall-make-the-required-inspections?---ans-✔✔Building-official
IRC-Amendments-R104.4
A-permit-is-required-for-work-including-but-not-limited-to-repairs-for-substantial-cutting-of-
walls---ans-✔✔IRC-Amendments-R105.2.2-Repairs
The-building-official-shall-issue-or-deny-a-permit-within-___-days-of-filing---ans-✔✔30-days
IRC-Amendments-R105.3.1-Action-on-Application
How-many-days-does-a-building-inspector-have-to-act-on-a-permit-application
a.)-180-days
b.)-90-days
c.)-30-days
d.)-60-days---ans-✔✔c.)-30-days
IRC-Amendments-R105.3.1-Action-on-Application
Every-permit-issued-shall-become-invalid-unless-the-work-authorized-by-such-permit-is-
commended-within-___-days.-The-building-official-can-grant-one-or-more-extensions-for-
periods-not-more-than-____-days---ans-✔✔180-days,-90-days
IRC-Amendments-R105.3.2-Time-Limitation-on-Application
, A-permit-may-be-suspended-or-revoked-for-all-of-the-following-reasons,-except
a.)-where-it-is-issued-in-error
b.)-on-the-basis-of-incomplete-information
c.)-where-issued-in-violation-of-jurisdictional-ordinance
d.)-where-other-permits-by-the-contractor-have-been-voided---ans-✔✔d.)-where-other-
permits-by-the-contractor-have-been-voided
IRC-Amendments-R105.6
Submittal-documents-consisting-of-construction-documents,-and-other-data-shall-be-
submitted-in-____-or-more-sets-with-each-application-for-a-permit---ans-✔✔two-sets
IRC-Amendments-R107.1-Submittal-Documents
Townhouse-buildings-greater-than-35,000-square-feet-require-a-______---ans-
✔✔registered-design-professional
IRC-Amendments-R107.1.6-Townhouse-buildings-greater-than-35,000-square-feet
On-which-drawing-will-you-find-the-building-location-and-lot-lines?---ans-✔✔Site-plan/plot-
plan
IRC-Amendments-R107.2-Site-Plan-or-Plot-Plan
Who-should-the-building-official-notify-inspections-for-on-site-construction?---ans-
✔✔permit-holder
R109.1-Type-of-inspections
What-is-required-for-a-certificate-of-occupancy
1a)-building-permit-number
b.)-assessed-value-of-the-structure
c.)-the-name-of-the-building-official
d.)-design-occupant-load---ans-✔✔b.)-assessed-value-of-the-structure
111.2-certificate-of-occupancy
A-stop-work-is-given-to-all-but-the-following
a.)-tenant-of-the-space
b.)-owner's-authorized-agent
c.)-person-performing-the-work
d.)-owner-of-the-property-involved---ans-✔✔a.)-tenant-of-the-space
R114.1
Retaining-walls-less-than-____-feet-in-height-requires-a-construction-supervisor-license---
ans-✔✔10-feet
IRC-special-regulations-table-110.R5.1-Construction-supervisor-License-(CSL)-Scope-of-
Work
A-construction-supervisor-license-is-required-for-all-but-the-following
a.)-swimming-pools
b.)-Buildings-or-structures-for-agricultural-use