Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

G&W RailRoad Test Questions with Correct Answers

Rating
-
Sold
-
Pages
6
Grade
A+
Uploaded on
07-05-2026
Written in
2025/2026

Exam of 6 pages for the course GCOR at GCOR (G&W RailRoad Test)

Institution
GCOR
Course
GCOR

Content preview

G&W RailRoad Test

Only a roadway worker who is qualified as an employee in-charge (EIC) shall establish
or have control over working limits for the purpose of establishing on-track safety. -
answerTrue

The space between Roadway Machine(s) and Roadway Worker(s) on the same track
will be a minimum of ______ feet. - answer50

Train approach warning shall be given in the sufficient time to enable each roadway
worker to move and occupy a previously arranged place of safety not less than ___
seconds before the arrival of a train, engine or other roadway equipment moving at the
maximum speed authorized on the track at the work site. - answer15

The use of any electronic device is prohibited if that use would interfere with an
employee's performance of safety related duties. - answertrue

A Watchman/lookout's sole duty is to look out for approaching trains/ on-track
equipment and provide warning to allow Roadway Workers to move to and accupy the
designated place of safety at least ____ seconds before the arrival of trains/ on-track
equipment. - answer15

Never cross tracks closer than ____ feet from standing equipment. - answer50

An employee who requests a track authority must inform the train dispatcher of: -
answerAll of the above

the employee-in-charge of the Form B must contact the __________ prior to occupying
the Form B limits. A job briefing will be conducted which will include an update of any
train or on-track equipment movements within the limits as well as documenting the time
of occupancy of the Form B. - answerTrain Dispatcher

the term "qualified" as used in connection with Railroad Workplace Safety, means a
status attained by an employee who: - answerAll of the above

Individual Train Detection (ITD) is a form of ON-Track safety that can be used only by a:
- answerLone Worker

Which of the following should be included in a complete Job Briefing? - answerAll of the
above

every roadway worker that depends upon Train Approach Warning for on-track safety
shall maintain a position that will enable him or her to receive a train approach warning

, communicated by a watchman/lookout at any time while on-track safety is provided by
train approach warning. - answerTrue

If there is a safety related issue to be resolved through the access to the On-track safety
manual, then the roadway work group or lone worker must move to the clear of the track
until the issue is resolved. - answertrue

When not in use, a cell phone must be: - answerturned off and stowed out of sight

Yellow-red and Red Flags must be displayed as required in the operating rules, prior to
the Form B being occupied by Roadway Workers (GCOR rules 5.4.3, 5.4.6 and 5.4.7)
Yellow-red flags must be displayed ______ miles before the restricted area. - answer2

Job Briefing must be updated after: - answerA meal Period.

A Lone Worker who chooses to use individual train detection to establish on-track safety
shall first complete a written Statement of ON-track Safety. - answerTrue

Watchmen may be assigned other job-related duties while functioning as a watchman. -
answerFalse

the placement of an individual or an item of equipment in such proximity to a track that
the individual or equipment could be struck by a moving train or on-track equipment, or
in case is withing 4 ft of the field side of the near running rail for a worker and 7 ft for
vehicles and machinery is known as: - answerFouling a Track

If there is ever any quesitons concerning safety, employees must stop and ask before
proceeding. - answerTrue

Working limits may be established on __________ tracks by use of the provisions of
Inaccessible Track. - answerNot-Controlled

Railroad employees or employees of a contractor operating roadway equipment must
never leave controls of the equipment unattended. If the employee has a need to leave
the equipment for any reason: - answerAll of the above

Train approach warning may be used to provide on-track safety for a roadway work
group using roadway maintenance machines, equipment, or material that cannot be
readily removed by hand. - answerFalse

Training for Roadway workers shall be provided to new employees required to work in
the foul of a track. Roadway Workers must be familiar with railroad tracks and
understand the space around them when and were on-track safety is required. They
must be familiar with other persons functions and responsibilities with on-track safety
procedures. they must understand signals given by watchman and know the procedures

Written for

Institution
GCOR
Course
GCOR

Document information

Uploaded on
May 7, 2026
Number of pages
6
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$18.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
julianah420 Phoenix University
View profile
Follow You need to be logged in order to follow users or courses
Sold
708
Member since
3 year
Number of followers
328
Documents
35816
Last sold
6 days ago
NURSING,TESTBANKS,ASSIGNMENT,AQA AND ALL REVISION MATERIALS

On this page, you find all documents, package deals, and flashcards offered by seller julianah420

4.2

157 reviews

5
102
4
21
3
12
2
6
1
16

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions