1. What is Anaplan Planual? - Correct Answer: The Planual provides a
systematic set of standards for model building on the Anaplan platform.
Designed to produce the most efficient, usable, and scalable Anaplan
models, while dramatically increasing performance for models in all
contexts.
2. When to create a change communication plan? - Correct Answer:
During project planning.
Adjust this plan throughout the release phases.
3. What are all the phases of Anaplan implementation? - Correct Answer:
1. Pre-release
2. Foundation
3. Implementation
4. Testing
5. Deployment
4. When does Pre-release phase begin? - Correct Answer: When a
customer asks for an estimate.
, Complete a form & participate in short scoping session --> Rough cut
estimate.
If decides to move forward --> full scope meeting --> Statement of Work
(SOW).
Once SOW signed --> project is added to the implementation project
schedule.
5. What is Statement of Work and what does it define? - Correct Answer:
The Statement of Work is a letter of intent. It definesL
- project-specific activities
- project deliverables
- project timeline
- business requirements
- pricing
6. What SOW estimates? - Correct Answer: - size of the model (memory
requirement or size in memory)
- scope of work (business requirements)
- level of effort to design and build the model
7. What are model size considerations? - Correct Answer: - each cell is
approx 10 bytes of data
- also include memory for the list members and list properties
- can't use this method to calculate size of a Polaris model
8. User base and concurrency estimates - Correct Answer: - who will be
accessing the model and how often?
, - having an accurate estimate of how many users will be using Anaplan
at the same time is critical to building the model to meet
performance expectations.
- a distributed model may be required
9. What is scope of work? - Correct Answer: defines all the business
requirements
10.What does project scope describe? - Correct Answer: - current state
overview
- project objectives
- a high level drawing of the ecosystem, with the Anaplan solution
identified
- known unknowns
11.What are the known unknowns of a project? - Correct Answer: -
resources for the project
- data and meta data
- process surrounding the model
12.What are key milestones in a project timeline? - Correct Answer: -
project kickoff
- planning
- model build and execution
- testing
- parallel support and go live