Gas piping must be tested by the _____ before operation.
Contractor
For oil burning systems, ____ ____ giving instructions for
the care and operation of the system shall be
permanently located in an easily _____ and _____
location near the equipment.
Instruction Cards, visible, accessible
No oil burning equipment shall be operated until an
equipment ____ _____ has been issued by the
commissioner, the requirements of the ____ ____ control
code have been met and until the approval for the
storage of ____ ____ has been given by the fire
commissioner.
Page 1 of 25
,Use permit, air pollution, fuel oil
Every oil burning installation that is not fully automatic
or requires preheating shall be operated under the
direct supervision of a person holding a ____ ___ ______
issued by the FD.
COF
Such person must be in the building at ____ ____ while in
operation and present in the _____ _____ during startup.
All times, boiler room
After any repairs to the boiler are made, ______ shall
check the repairs and the functioning of all ____ _____
and the positioning of the ______.
Operators, control devices, valves
All heating and combustion equipment that is fired with
solid, liquid, or gas fuels, must comply with the
requirements of the ____ _____ _____ code.
Page 2 of 25
, Air pollution control
Low Temp Equipment have a temp of ____ degrees at
the point of leaving the equipment.
600 or less
Median Temp Equipment have a temp of between ___
and ___ degrees F at the point of leaving the equipment
under normal conditions.
600 and 1000
High Temp Equipment have a temp of ____ or ____
degrees F leaving the equipment.
1000 or greater
A fill line in an oil burner system is a line used to:
Fill the storage tank with oil.
The aquastat is located
Page 3 of 25
ACTUAL EXAM 2026 | WITH COMPLETE QUESTIONS
AND CORRECT ANSWERS |GRADED A+// VERIFIED
ANSWERS | | NEWEST EXAM
Gas piping must be tested by the _____ before operation.
Contractor
For oil burning systems, ____ ____ giving instructions for
the care and operation of the system shall be
permanently located in an easily _____ and _____
location near the equipment.
Instruction Cards, visible, accessible
No oil burning equipment shall be operated until an
equipment ____ _____ has been issued by the
commissioner, the requirements of the ____ ____ control
code have been met and until the approval for the
storage of ____ ____ has been given by the fire
commissioner.
Page 1 of 25
,Use permit, air pollution, fuel oil
Every oil burning installation that is not fully automatic
or requires preheating shall be operated under the
direct supervision of a person holding a ____ ___ ______
issued by the FD.
COF
Such person must be in the building at ____ ____ while in
operation and present in the _____ _____ during startup.
All times, boiler room
After any repairs to the boiler are made, ______ shall
check the repairs and the functioning of all ____ _____
and the positioning of the ______.
Operators, control devices, valves
All heating and combustion equipment that is fired with
solid, liquid, or gas fuels, must comply with the
requirements of the ____ _____ _____ code.
Page 2 of 25
, Air pollution control
Low Temp Equipment have a temp of ____ degrees at
the point of leaving the equipment.
600 or less
Median Temp Equipment have a temp of between ___
and ___ degrees F at the point of leaving the equipment
under normal conditions.
600 and 1000
High Temp Equipment have a temp of ____ or ____
degrees F leaving the equipment.
1000 or greater
A fill line in an oil burner system is a line used to:
Fill the storage tank with oil.
The aquastat is located