Mass Hoisting Test questions with
| | | | |
precise detailed answers
| |
What |is |the |purpose |of |the |swing |gear |on |an |excavator |- |ANSWER✔✔✔-It |connects |the |car |
body |to |the |tracks
Who |is |responsible |for |inspecting |a |trench |before |anyone |goes |in |it |- |ANSWER✔✔✔-The |
equipment |operator
What |is |the |preferred |sling |angle |of |these |angles?
60 |degrees |
45 |degrees |
30 |degrees |- |ANSWER✔✔✔-60 |degrees
The |top |of |the |spoil |pile |is |called |- |ANSWER✔✔✔-Crown
A |four |foot |deep |trench |requires |an |additional |ladder |for |every |_______of |open |trench |- |
ANSWER✔✔✔-25 |feet
Materials |must |be |kept |back |from |the |edge |of |the |trench |a |minimum |of |- |ANSWER✔✔✔-Two |
feet
When |can |an |inspector |revoke |a |hoisting |license |- |ANSWER✔✔✔-For |failure |to |pay |excise |tax
Who |developed |the |massachusets |crane |hand |signals |- |ANSWER✔✔✔-American |National |
standards |instatute |/American |society |mechanical |engineers
,DOT |stands |for |- |ANSWER✔✔✔-Department |of |transportation
When |do |you |do |your |walk |around |of |the |equipment |- |ANSWER✔✔✔-Before |you |start |it
In |the |one |to |1 |sloping |ratio |what |does |the |second |one |represent |- |ANSWER✔✔✔-Depth |or |
vertical |rise
On |a |track |machine |the |gears |should |be |where |- |ANSWER✔✔✔-In |the |rear
When |load |leveling |when |do |you |deploy |your |stabilizes |or |load |levelers |before |or |after |you |
make |the |lift |- |ANSWER✔✔✔-Before |you |make |your |lift
When |backfilling |an |excavation |you |should |use |a |- |ANSWER✔✔✔-Small |lift |shade |the |ditch
In |the |state |of |Massachusetts |what |criteria |require |a |hoisting |license |- |ANSWER✔✔✔-The |
weight |of |the |load |exceeds |500 |pounds |the |height |of |the |load |exceeds |10 |feet |the |capacity |of |
the |bucket |exceeds |1/4 |cubic |yard
What |type |of |safety |system |is |used |on |de |energized |circuits |- |ANSWER✔✔✔-Lockout |tagout |
total |de |energization |system
In |what |time |frame |must |the |department |of |Public |Safety |be |notified |of |a |death |involving |
hoisting |equipment |- |ANSWER✔✔✔-Within |1 |hour
How |many |pounds |in |a |ton |- |ANSWER✔✔✔-2,000lbs
All |welding |and |cutting |on |hoisting |equipment |shall |be |done |in |accordance |with |the |
requirements |of |what? |- |ANSWER✔✔✔-American |welding |society |formerly |of |the |American |
Society |of |mechanical |engineers
, What |action |dose |the |signal |person |intend |the |operator |perform |if |he |extends |his |arm |at |
shoulder |height, |makes |a |fist |with |his |hand |and |sticks |his |thumb |up |- |ANSWER✔✔✔-Boom |up
What |type |of |protection |should |be |given |to |operators |of |material |handling |and |moving |
equipment |- |ANSWER✔✔✔-Protection |from |the |weather |safety |shatter |proof |glass |heat |in |
cold |weather |overhead |protection
What |law |governs |hoisting |equipment |in |the |state |of |Massachusetts |- |ANSWER✔✔✔-Chapter |
146 |of |the |general |laws |520 |CMR |section |6
How |do |you |test |the |load |brake |on |a |LULL |- |ANSWER✔✔✔-Lift |the |load |just |off |the |ground |
and |return |the |boom |handle |to |neutral |position
How |do |you |find |the |weight |of |a |load |- |ANSWER✔✔✔-Shipping |papers |data |tags |use |a |scale |
to |weigh |load |calculate |the |weight
What |must |be |stamped |on |all |load |rating |plates |- |ANSWER✔✔✔-Serial |number |of |the |lifting |
unit
The |boom |of |the |unit |you |are |operating |comes |in |contact |with |and |energized |power |line |
there's |no |sign |of |any |other |dangers |such |as |fire |what |should |you |do |- |ANSWER✔✔✔-Stay |in |
the |cab |until |the |lines |are |de-energized
Can |you |prohibit |the |Department |of |Public |Safety |from |your |premises |- |ANSWER✔✔✔-No
Before |digging |anywhere |who |do |you |call |and |how |much |notice |must |you |give |- |
ANSWER✔✔✔-Dig |safe |72 |hours |3 |days |minimum |30 |days |maximum
| | | | |
precise detailed answers
| |
What |is |the |purpose |of |the |swing |gear |on |an |excavator |- |ANSWER✔✔✔-It |connects |the |car |
body |to |the |tracks
Who |is |responsible |for |inspecting |a |trench |before |anyone |goes |in |it |- |ANSWER✔✔✔-The |
equipment |operator
What |is |the |preferred |sling |angle |of |these |angles?
60 |degrees |
45 |degrees |
30 |degrees |- |ANSWER✔✔✔-60 |degrees
The |top |of |the |spoil |pile |is |called |- |ANSWER✔✔✔-Crown
A |four |foot |deep |trench |requires |an |additional |ladder |for |every |_______of |open |trench |- |
ANSWER✔✔✔-25 |feet
Materials |must |be |kept |back |from |the |edge |of |the |trench |a |minimum |of |- |ANSWER✔✔✔-Two |
feet
When |can |an |inspector |revoke |a |hoisting |license |- |ANSWER✔✔✔-For |failure |to |pay |excise |tax
Who |developed |the |massachusets |crane |hand |signals |- |ANSWER✔✔✔-American |National |
standards |instatute |/American |society |mechanical |engineers
,DOT |stands |for |- |ANSWER✔✔✔-Department |of |transportation
When |do |you |do |your |walk |around |of |the |equipment |- |ANSWER✔✔✔-Before |you |start |it
In |the |one |to |1 |sloping |ratio |what |does |the |second |one |represent |- |ANSWER✔✔✔-Depth |or |
vertical |rise
On |a |track |machine |the |gears |should |be |where |- |ANSWER✔✔✔-In |the |rear
When |load |leveling |when |do |you |deploy |your |stabilizes |or |load |levelers |before |or |after |you |
make |the |lift |- |ANSWER✔✔✔-Before |you |make |your |lift
When |backfilling |an |excavation |you |should |use |a |- |ANSWER✔✔✔-Small |lift |shade |the |ditch
In |the |state |of |Massachusetts |what |criteria |require |a |hoisting |license |- |ANSWER✔✔✔-The |
weight |of |the |load |exceeds |500 |pounds |the |height |of |the |load |exceeds |10 |feet |the |capacity |of |
the |bucket |exceeds |1/4 |cubic |yard
What |type |of |safety |system |is |used |on |de |energized |circuits |- |ANSWER✔✔✔-Lockout |tagout |
total |de |energization |system
In |what |time |frame |must |the |department |of |Public |Safety |be |notified |of |a |death |involving |
hoisting |equipment |- |ANSWER✔✔✔-Within |1 |hour
How |many |pounds |in |a |ton |- |ANSWER✔✔✔-2,000lbs
All |welding |and |cutting |on |hoisting |equipment |shall |be |done |in |accordance |with |the |
requirements |of |what? |- |ANSWER✔✔✔-American |welding |society |formerly |of |the |American |
Society |of |mechanical |engineers
, What |action |dose |the |signal |person |intend |the |operator |perform |if |he |extends |his |arm |at |
shoulder |height, |makes |a |fist |with |his |hand |and |sticks |his |thumb |up |- |ANSWER✔✔✔-Boom |up
What |type |of |protection |should |be |given |to |operators |of |material |handling |and |moving |
equipment |- |ANSWER✔✔✔-Protection |from |the |weather |safety |shatter |proof |glass |heat |in |
cold |weather |overhead |protection
What |law |governs |hoisting |equipment |in |the |state |of |Massachusetts |- |ANSWER✔✔✔-Chapter |
146 |of |the |general |laws |520 |CMR |section |6
How |do |you |test |the |load |brake |on |a |LULL |- |ANSWER✔✔✔-Lift |the |load |just |off |the |ground |
and |return |the |boom |handle |to |neutral |position
How |do |you |find |the |weight |of |a |load |- |ANSWER✔✔✔-Shipping |papers |data |tags |use |a |scale |
to |weigh |load |calculate |the |weight
What |must |be |stamped |on |all |load |rating |plates |- |ANSWER✔✔✔-Serial |number |of |the |lifting |
unit
The |boom |of |the |unit |you |are |operating |comes |in |contact |with |and |energized |power |line |
there's |no |sign |of |any |other |dangers |such |as |fire |what |should |you |do |- |ANSWER✔✔✔-Stay |in |
the |cab |until |the |lines |are |de-energized
Can |you |prohibit |the |Department |of |Public |Safety |from |your |premises |- |ANSWER✔✔✔-No
Before |digging |anywhere |who |do |you |call |and |how |much |notice |must |you |give |- |
ANSWER✔✔✔-Dig |safe |72 |hours |3 |days |minimum |30 |days |maximum