Full Practice Exam (2026 Edition)
Total Questions: 50 | Passing Score: 75% | Time: 90
minutes


SECTION 1: CPM & NETWORK LOGIC (Questions 1–10)
1. Which relationship type requires Activity B to finish
before Activity A can start?
A) FS
B) FF
C) SS
D) SF
VERIFIED ANSWER: D) SF (Start-to-Finish)
Rationale: SF is rare but reverses the dependency: B
finishes so A can start.
2. If Activity A (5 days) and B (7 days) overlap with SS+2
lag, what is the earliest B can finish?
A) 5 days
B) 7 days
C) 9 days
D) 12 days

,VERIFIED ANSWER: C) 9 days
Rationale: B starts at time 2 (after A starts), duration 7 →
EF = 9.
3. Which is NOT a required element for a logic-driven
CPM schedule?
A) Unique activity ID
B) Calendar assignment
C) Resource cost
D) Predecessor/successor links
VERIFIED ANSWER: C) Resource cost
Rationale: Cost is for EVM, not CPM logic.
4. What does a negative total float of -3 days indicate?
A) Project will finish 3 days early
B) Milestone is constrained earlier than logic allows
C) Free float is also negative
D) Schedule has no critical path
VERIFIED ANSWER: B) Milestone is constrained earlier
than logic allows
Rationale: Negative float = imposed date earlier than
calculated early finish.
5. In a PDM network, what is the maximum number of
logical relationships between two activities?
A) 1

,B) 2
C) 3
D) 4
VERIFIED ANSWER: D) 4
Rationale: FS, SS, FF, SF all possible between same pair.
6. Which float is consumed without affecting successors?
A) Total float
B) Free float
C) Project float
D) Independent float
VERIFIED ANSWER: B) Free float
Rationale: Free float = delay available before any
successor’s early start is impacted.
7. A hammock activity’s duration is calculated by:
A) Resource loading
B) Difference between two dates
C) Fixed duration entered by user
D) Monte Carlo simulation
VERIFIED ANSWER: B) Difference between two dates
Rationale: Hammock stretches from its start anchor to
end anchor dates.

, 8. What is the critical path’s total float?
A) Positive
B) Zero or negative
C) Equal to project float
D) Always zero
VERIFIED ANSWER: B) Zero or negative
Rationale: Critical path has minimum float (can be
negative under constrained dates).
9. If an activity has 2 days free float and 5 days total
float, delaying it by 3 days will:
A) Delay project by 1 day
B) Delay successors by 1 day
C) Delay project by 0 days, successors by 1 day
D) Delay project by 3 days
VERIFIED ANSWER: C) Delay project by 0 days,
successors by 1 day
Rationale: 3 days uses all free float (2 days) + 1 day of
total float → impacts successors but not project (since
total float not fully consumed).
10. Which best describes a mandatory dependency?
A) Preferred sequence
B) Legal requirement

Documentinformatie

Geüpload op
30 april 2026
Aantal pagina's
67
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
$25.49

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
BestNurse01
3.0
(3)
Verkocht
34
Volgers
2
Items
4357
Laatst verkocht
1 week geleden



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen