●● The number of employees that will require a contractor to obtain
workmen's compensation insurance is __________ or more full or part
time employee(s).
a. One
b. Two
c. Four
d. Ten
Answer: a. one
●● The __________ usually prepares the project schedule.
a. Architect
b. Owner
c. Project Manager
d. Engineer
Answer: c. Project manager
,●● The type of insurance that covers the contractor for losses of material
in transit or at temporary storage facilities is known as __________
insurance.
a. Liability
b. Builder's Risk
c. Auto liability
d. Fidelity bond
Answer: b. Builder's Risk
●● If at all possible, sling angles should be kept greater than
__________ degrees.
a. 25
b. 45
c. 60
d. 90
Answer: b. 45
●● __________ days is the maximum time after commencing
construction for the contractor to give notice to the owner of his lien
rights.
a. 30
b. 45
c. 60
, d. 90
Answer: b. 45
●● An action for breach of a written contract must be brought within
__________ years.
a. 2
b. 3
c. 4
d. 5
Answer: d. 5
●● All of the following must follow the OSHA standards except
__________.
a. Religious establishments
b. A general contractor with one employee
c. Landscape contractors
d. An equipment rental businesses
Answer: a. Religious establishments
●● The type of estimate that provides precise statements of quantities of
materials, equipment and manpower is considered to be a(n)
__________.
a. Materials estimate
COMPREHENSIVE STUDY 2026 QUESTIONS
SOLUTIONS GRADED PREMIUM FILE
●● The number of employees that will require a contractor to obtain
workmen's compensation insurance is __________ or more full or part
time employee(s).
a. One
b. Two
c. Four
d. Ten
Answer: a. one
●● The __________ usually prepares the project schedule.
a. Architect
b. Owner
c. Project Manager
d. Engineer
Answer: c. Project manager
,●● The type of insurance that covers the contractor for losses of material
in transit or at temporary storage facilities is known as __________
insurance.
a. Liability
b. Builder's Risk
c. Auto liability
d. Fidelity bond
Answer: b. Builder's Risk
●● If at all possible, sling angles should be kept greater than
__________ degrees.
a. 25
b. 45
c. 60
d. 90
Answer: b. 45
●● __________ days is the maximum time after commencing
construction for the contractor to give notice to the owner of his lien
rights.
a. 30
b. 45
c. 60
, d. 90
Answer: b. 45
●● An action for breach of a written contract must be brought within
__________ years.
a. 2
b. 3
c. 4
d. 5
Answer: d. 5
●● All of the following must follow the OSHA standards except
__________.
a. Religious establishments
b. A general contractor with one employee
c. Landscape contractors
d. An equipment rental businesses
Answer: a. Religious establishments
●● The type of estimate that provides precise statements of quantities of
materials, equipment and manpower is considered to be a(n)
__________.
a. Materials estimate