Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 34 pages
Exam (elaborations)

COMBAT CONSTRUCTION EXAM 2026 FINAL ASSESSMENT PAPER CONSTRUCTION PLANNING COMPREHENSIVE QUESTIONS AND ANSWERS VERIFIED A+

Document preview thumbnail
Preview 4 out of 34 pages

COMBAT CONSTRUCTION EXAM 2026 FINAL ASSESSMENT PAPER CONSTRUCTION PLANNING COMPREHENSIVE QUESTIONS AND ANSWERS VERIFIED A+

Content preview

COMBAT CONSTRUCTION EXAM 2026 FINAL
ASSESSMENT PAPER CONSTRUCTION
PLANNING COMPREHENSIVE QUESTIONS AND
ANSWERS VERIFIED A+

◉ Typical formwork material. Answer: 3/4" plywood that is coated
on one side


◉ Types of concrete formwork. Answer: Slab Formwork
Beam Formwork
Column/Wall Formwork (look at photos)


◉ Equation for Lateral Pressures of Concrete. Answer: ACI 347R-14
Table 4.2.2.1a(a)


◉ Project Management Process Groups. Answer: Initiation ->
Planning -> executing -> Controlling and monitoring (loop back to
planning) -> closing
Ex. of loop (Value Engineering)


◉ Gantt Chart. Answer: Small to mid-size projects
Forecast & manage resources (labor, equipment, budgets, etc)

,Disadvantage: doesn't show all the links/sequencing


◉ Critical Path Method (CPM). Answer: Project modeling technique
that identifies the most critical activities on a schedule
Helps monitor the assets, expenses, and advancement of the project
Activity on Node (AON) is most common


◉ PERT. Answer: Program Evaluation Review Technique (also
known as CPM)


◉ Float Time (slack time). Answer: Amount of time that an activities
can be delayed without affecting the overall schedule (applies to
activities not on CP)


◉ Applying the CPM (steps). Answer: 1. Specify each activity
2. Sequence the activities
3. Draw the network diagram
4. Identify the CP
5. Update to show progress


◉ AOA (Activity on Arc)
Define Dummy Nodes & Dummy Activities. Answer: Dummy Node:
Used when 2 activities have the same starting and ending event

,Dummy Activity: Have no duration, used to prevent an activity from
occurring in more than 2 spot


◉ Contract Documents (what is included?). Answer: Contract Terms
Quantity and cost estimates
project and task descriptions (SOW)
Specification of the deliverables
Time, resources, and payment


◉ Design Sequencing Phases. Answer: Schematic Design
Design Development
Construction Documents
Bidding Process


◉ Project Costs. Answer: Direct Costs (Raw materials, labor, fuel,
etc)
Indirect Costs (Overhead, taxes, administrative)


◉ Find the correct sequence for a building foundation
i. Site clearing
ii. Installing sewers & other utilities
iii. Excavation for utility trenches

, iv. Grading general area
v. Formwork and reinforcement
vi. Pour concrete. Answer: i,iv,iii,v,ii,vi


◉ Assumptions for Engineering Economics Problems. Answer:
Inflation is 0% through lifetime of project
Effective interest rate is constant through lifetime of project
Year-end convention (earnings & cash flows occur at the end of the
year)


◉ Single Payment Cash Flow. Answer:


◉ Uniform Series Cash Flow. Answer:


◉ Gradient Series Cash Flow. Answer:


◉ Exponential Gradient Series. Answer:


◉ Equivalence (cash flow). Answer: Used to compare earnings and
cash flows that occur at different times


◉ Effective Stress. Answer: A portion of the total stress which is
carried by the soil grains (particle to particle contact)

Document information

Uploaded on
April 28, 2026
Number of pages
34
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
FocusFile7
3.9
(24)
Sold
231
Followers
3
Items
60822
Last sold
4 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions