Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 55 pages
Exam (elaborations)

NYC HEALTH HOSPITALS ELECTRICIAN EXAM | ULTIMATE QUESTION BANK WITH VERIFIED CORRECT ANSWERS | GUARANTEED SUCCESS

Document preview thumbnail
Preview 4 out of 55 pages

NYC HEALTH HOSPITALS ELECTRICIAN EXAM | ULTIMATE QUESTION BANK WITH VERIFIED CORRECT ANSWERS | GUARANTEED SUCCESS

Content preview

NYC HEALTH HOSPITALS ELECTRICIAN EXAM
| ULTIMATE QUESTION BANK WITH VERIFIED
CORRECT ANSWERS | GUARANTEED SUCCESS


1. Under the New York City Electrical Code (NYCEC)
Chapter 1, all electrical work in NYC Health +
Hospitals facilities must be performed by a licensed
electrician. The license is issued by the:
A) NYC Department of Buildings (DOB)
B) NYC Health + Hospitals Corporation
C) NYS Department of Labor
D) NYC Fire Department (FDNY)


Correct answer: A
Rationale: The NYC DOB issues electrician licenses
(Master Electrician, Special Electrician).


2. Under NFPA 99 (Health Care Facilities Code), a
hospital’s “essential electrical system” (EES) must
consist of two branches: the “critical branch” and
the:
A) Life safety branch
B) Equipment branch

,C) Emergency branch
D) Both A and B


Correct answer: D
Rationale: NFPA 99 requires life safety branch
(egress, fire alarm) and equipment branch (medical
equipment).


3. A hospital electrician in NYC is installing a
receptacle in a patient care area (general care).
Under NYCEC §517.18, the receptacle must be
“hospital grade” and must be tested for:
A) Ground integrity (using a receptacle tester)
B) Voltage drop
C) Ampacity
D) Insulation resistance


Correct answer: A
Rationale: Hospital grade receptacles must be tested
for ground integrity (no open ground).


4. Under NFPA 70 (NEC) Article 517, “patient care
areas” are classified as “general care” or “critical

,care.” The required number of receptacles in a
critical care patient room (single bed) is:
A) 4
B) 6
C) 8
D) 10


Correct answer: C
Rationale: Critical care rooms require at least 8
receptacles per bed (or 12 for multiple beds).


5. Under NYCEC §517.30, the “normal power source”
for a hospital’s essential electrical system must be
capable of supplying the load for a minimum of:
A) 1 hour
B) 2 hours
C) 4 hours
D) 8 hours


Correct answer: C
Rationale: The normal source (utility) must be
capable of supplying essential loads for 4 hours (or
as specified).

, 6. A hospital electrician in NYC is testing an “isolated
power system” (IPS) in an operating room. Under
NFPA 99, the line isolation monitor (LIM) must alarm
when the total hazard current exceeds:
A) 1 mA
B) 2 mA
C) 5 mA
D) 10 mA


Correct answer: C
Rationale: LIM alarms at 5 mA (or 2 mA for older
systems).


7. Under NYCEC §517.16, the “emergency system”
(generator) for a hospital must be capable of starting
and supplying full load within:
A) 5 seconds
B) 10 seconds
C) 30 seconds
D) 60 seconds


Correct answer: B

Document information

Uploaded on
April 27, 2026
Number of pages
55
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$22.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
IsaacRobie
4.0
(78)
Sold
341
Followers
156
Items
4377
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions