Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 38 pages
Exam (elaborations)

MEDICAL GAS 6010 INSTALLERS PRACTICE FINAL EXAM 2026 QUESTIONS AND ANSWERS STUDY GUIDE VERIFIED A+ SOLUTIONS

Document preview thumbnail
Preview 4 out of 38 pages

MEDICAL GAS 6010 INSTALLERS PRACTICE FINAL EXAM 2026 QUESTIONS AND ANSWERS STUDY GUIDE VERIFIED A+ SOLUTIONS

Content preview

MEDICAL GAS 6010 INSTALLERS PRACTICE
FINAL EXAM 2026 QUESTIONS AND
ANSWERS STUDY GUIDE VERIFIED A+
SOLUTIONS

●● Cylinder and cryogenic liquid container outlet connections shall be
designed as to render the attachment point _ when removal of the outlet
connection is attempted. A) reusable B) unusable C) unsuitable D)
universal.
Answer: B) unusable


●● Cylinders in use and in storage shall be prevented from reaching
temperatures in excess of _ *F. A) 120 B) 125 C) 130 D) 135.
Answer: B) 125


●● Nitrous oxide and carbon dioxide using cylinders or portable
containers shall be prevented from reaching temperatures lower than _
*F A) 130 B)125 C) 20 D) -20.
Answer: C)20


●● Which of the following systems shall not be permitted to be located
in an outdoor enclosure? A) bulk cryogenic liquid cylinders B)
manifolds for gas cylinders C) manifolds for cryogenic liquid containers
D) medical air sources.

,Answer: D) medical air sources


●● Indoor locations for oxygen, nitrous oxide, and mixtures of these
gases shall not communicate with any of the following except _? A) area
with open flames B) designated storage area C) engines D) kitchens.
Answer: B) designated storage area


●● Locations for central supply systems shall have _ devices protected
from physical damage? A) electrical B) pressure indicating C) regulating
D) relief.
Answer: A) electrical


●● Outdoor locations surrounded by impermeable walls, except fire
barrier walls, shall have protected ventilation openings at the _ of each
wall to allow free circulation of air within the enclosure? A) base B)
corner) C) middle D) top.
Answer: A) base


●● All positive pressure supply systems shall be provided with duplex
line pressure regulators piped in _? A) circuit B) loop C) parallel D)
series.
Answer: C) parallel


●● All pressure relief valves shall be made of brass, bronze, or _? A)
carbon steel B) cast iron C) copper D) stainless steel.

,Answer: D) stainless steel


●● Central supply systems for positive pressure gases shall have one or
more relief valves, the valves shall have a relief setting that is _% above
normal working operating pressure? A) 30 B) 40 C) 50 D) 60.
Answer: C) 50


●● When vented to the outside, relief valve vent lines shall be labeled in
which way? A) adhesive markers B) any manner that will distinguish
them from the medical gas pipeline C) stenciling D) stickers.
Answer: B) any manner that will distinguish them from the medical gas
pipeline


●● An auxiliary source connection shall consist of all of the following
except? A) removable plug or cap B) tee C) valve D) visual pressure
indicator.
Answer: D) visual pressure indicator


●● In central supply systems using gas or liquid cylinders, each header
shall have a _ to prevent debris from entering the manifold controls? A)
check valve B) filter C) monitor D) relief valve.
Answer: B) filter

, ●● Manifolds for gas cylinders shall consist of two equal headers, each
with enough cylinders for an average day's supply, but not fewer than _
connections? A) 5 B) 4 C) 3 D) 2.
Answer: D) 2


●● Manifolds for gas cylinders shall have a(n) _ signal that visibly
indicates the operating status of the equipment and shall activate an
indicator at all master alarm panels when or just before changeover from
one header to the other takes place? A) area B) master C) local D) zone.
Answer: C) local


●● When multiple buildings are served from a single cryogenic liquid
oxygen source, it is required to place the emergency oxygen supply
connection in _ ? A) each building served B) the building closest to the
source C) the largest building served D) the main building only.
Answer: A) each building served


●● The minimum clearance around EOSC for a temporary source of
supply is _ ft? A) 2 B) 3 C) 5 D) 6.
Answer: B) 3


●● A(n) _ emergency reserve system can be substituted for the EOSC?
A) auxiliary B) backup C) in-building D) micro-bulk.
Answer: C) in-building

Document information

Uploaded on
April 26, 2026
Number of pages
38
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TopGradeInsider
4.2
(12)
Sold
144
Followers
1
Items
51004
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions