Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 15 pages
Exam (elaborations)

PJM Transmission Operations Test with all Correct & 100% Verified Answers |Latest Version |Already Graded A+

Document preview thumbnail
Preview 2 out of 15 pages

PJM Transmission Operations Test with all Correct & 100% Verified Answers |Latest Version |Already Graded A+

Content preview

PJM Transmission Operations Test with all Correct & 100%
Verified Answers |Latest Version |Already Graded A+

What is the submission requirement for a planned transmission outage of 20 calendar days that
is scheduled to start on October 10 and be considered on time
A. September 30
B. April 1
C. October 1
D. September 1 ✔Correct Answer-B. April 1

Since PJM operates to a 5% voltage drop limit on the 500 KV system which of the following
would be considered a violation
A. Pre-536KV, post - 507KV
B. Pre-545 kV, post - 520 KV
C. Pre-535KV, post - 512 KV
D. Pre-530 KV, post - 515 KV ✔Correct Answer-A. Pre-536KV, post-507KV

If a transmission line is loaded above it's surge impedance loading what impact would it have on
system voltage
A. Lower the voltage
B. Increase the voltage limits
C. Lower the voltage limits
D. Increase the voltage ✔Correct Answer-A. Lower the voltage

If your system is equipped with 500 KV capacitors that have automatic switching capability and
the capacitor is in service, what would be the expected operation of the capacitor if the voltage
were between 545KV and 550 KV for 1 to 15 minutes
A. The capacitor would be connected to the system
B. The capacitor would be disconnected from the system
C. There are no 500 KV automatically controlled capacitors
D. The capacitor should remain unchanged ✔Correct Answer-B. The capacitor would be
disconnected from the system

Your outage scheduling group has scheduled a planned outage to start today at 0800.
Unfortunately due to weather the outage will not start until tomorrow at 0700. In this instance
how will the outage status be treated
A. As a forced outage
B. As an unplanned outage
C. As on time
D. As late ✔Correct Answer-C. As on time

, The PJM system operator finds that a 230 KV transmission line is over its normal limit. How long
does the operator have to return the line to within its normal limit
A. Immediately
B. 5 minutes
C. 15 minutes
D. 30 minutes ✔Correct Answer-C. 15 minutes

The phase angle regulators between New York ISO & PJM are there to help
A. Maintain system VAR flow
B. Increase overall system voltages
C. Reduce market price at border
D. Control MW flows ✔Correct Answer-D. Control MW flows

When a discrepancy occurs between PJM's thermal rating and a transmission owners thermal
rating which limit is utilized to operate
A. The highest limit
B. The most conservative limit
C. PJM's limit only
D. Transmission owners limit only ✔Correct Answer-B. The most conservative limit

Which relay operates with no time delay when the current rises above a predetermined level
A. Time overcurrent
B. Directional overcurrent
C. Distance relay
D. Instantaneous overcurrent ✔Correct Answer-D. Instantaneous overcurrent

According to the PJM transmission operation manual, 500 KV lines that trip out of service
should
A. Be immediately manually re-closed by the operator
B. Be manually re-closed by the operator after 30 minutes
C. Automatically re-close
D. Automatically initiate a Quickstart CT ✔Correct Answer-C. Automatically re-close

All of the following information should be submitted with a transmission outage request except
A. Facility
B. Emergency restoration time
C. Description of work
D. Cost of the maintenance work ✔Correct Answer-D. Cost of the maintenance work

The PJM system operator finds that a 230 KV transmission line is over it's emergency limit. How
long does the operator have to return the limit to within its normal limit
A. Immediately
B. 5 minutes
C. 15 minutes

Document information

Uploaded on
April 21, 2026
Number of pages
15
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$16.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Studyclub
3.6
(14)
Sold
59
Followers
1
Items
12234
Last sold
1 week ago

Reviews from verified buyers



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions