with verified solu on 2026
Daily Affirma on
I am smart enough, I can do this.
It's not rocket surgery or brain science.
It's not that hard, just difficult.
I may need extra work or more prac ce.
I don't need to be perfect, I just have to try.
The ICC catalog entry for the Special Inspector General Requirements (GR) module states
that this is an _____ exam. Indica ng it is a _____ test type.
"Open Book" , naviga onal
Naviga onal means knowing where to find the answer is just as important as knowing the
answer. There is not enough me to look up every ques on.
The ICC catalog entry for the General Requirements (GR) module shows addi onal
informa on under _____ and _____ . Reference materials allowed during the exam are The
_____ and The _____ . This exam will focus on _____ , _____ , and _____ .
Info and Outline
Interna onal Building Code (IBC) , Special Inspec on Manual (SIM)
"Du es and Responsibili es" , "No fica on of Discrepancies" , and "Inspec on Reports"
The type and extent of each special inspec on shall be located in
the Statement of "Special Inspec ons"
IBC 1704.3.1
Who has the legal authority to enforce the "Special Inspec ons" provisions of the building
code?
building official
SIM 2012 Ch 3 "Du es and Responsibili es of the Building Official"
, Who can hire an approved inspec on agency?
Owner or owners agent
IBC 1704.2
Who can perform a structural observa on?
Registered design professional
IBC 1704.5
Who is required to receive the final report?
Building Department
SIM 2012 Ch 3 "Du es and Responsibili es of the Building Official""
One of the TASKS performed by the special inspector AT THE JOBSITE includes pos ng "Stop
Work" no ces for "Non-conformance" work observed.
False
SIM 2012 Ch 2 "At the Jobsite"
Who is responsible for providing access to the approved plans?
Contractor
SIM 2012 Ch 3 "Du es and Responsibili es of the Contractor"
Who shall the special inspector demonstrate competence to?
The Building Official
IBC 1704.2.1
Who can issue a "Stop Work" order?
Building Official
SIM 2012 Ch 3 "Du es and Responsibili es of the Building Official"
What type of inspec on is required for post-installed adhesive (epoxy) anchors placed in a
horizontal posi on to an exis ng 3000 PSI concrete wall?
Con nuous inspec on
IBC Table 1705.3