Clean Water Act Law set into place in 1970 for storm water
regulation
NPDES Regulations for monitoring storm water activity on
a construction site, are outlined in
Immediately after project is awarded When should you read and understand SWPP
and before you begin any site work
Contaminated ground water What is not an allowable storm water discharge or
non-storm water discharge
When jurisdiction of operations When may construction activity begin
specifies you can start
303D list Waters that fail anti-degradation list are placed on
which list.
An officer and project owner SWPPPs certification are signed by who
https://quizlet.com/1167624147/swppp-study-guide-exam-recent-exam-fully-solved-updated-2026-most-complete-2026-latest-update-2026-update-fla… 1/14
, 4/14/26, 9:38 AM SWPPP study guide Exam (Recent exam) Fully solved & updated 2026 Most COMPLETE (2026) (Latest Update 2026) UPDATE!! …
FALSE The document that must be completed signed and
submitted to the state to obtain authorization to
discharge is the NOT. (T/F)
All construction has been completed NOT can be filed when
both inside and outside
is in charge of daily activities Operations on a construction site are the entity in
charge of plans and specification and the entity
who?
Stay out of trouble with the law Motives for staying in compliance with storm water
objectives?
To protect and preserve beneficial Objectives of the clean water act are
use of U.S. waters, maintaining their
clean, physical and biological
integrity
National Pollutant Discharge NPDES stands for
Elimination System
Site description and maps, Which are a component of a good SWPPP
inspection and maintenance
procedure. Potential pollutant
sources, schedules of activities, site
contact information, plan
certification documents, site contact
info and descriptions of controls
BMP
False Construction sediment is not considered a
potential pollutant source (T/F)
https://quizlet.com/1167624147/swppp-study-guide-exam-recent-exam-fully-solved-updated-2026-most-complete-2026-latest-update-2026-update-fla… 2/14
SWPPP study guide Exam (Recent exam) Fully
solved & updated 2026 Most COMPLETE (2026)
(Latest Update 2026) UPDATE!!
Save
Terms in this set (119)
Clean Water Act Law set into place in 1970 for storm water
regulation
NPDES Regulations for monitoring storm water activity on
a construction site, are outlined in
Immediately after project is awarded When should you read and understand SWPP
and before you begin any site work
Contaminated ground water What is not an allowable storm water discharge or
non-storm water discharge
When jurisdiction of operations When may construction activity begin
specifies you can start
303D list Waters that fail anti-degradation list are placed on
which list.
An officer and project owner SWPPPs certification are signed by who
https://quizlet.com/1167624147/swppp-study-guide-exam-recent-exam-fully-solved-updated-2026-most-complete-2026-latest-update-2026-update-fla… 1/14
, 4/14/26, 9:38 AM SWPPP study guide Exam (Recent exam) Fully solved & updated 2026 Most COMPLETE (2026) (Latest Update 2026) UPDATE!! …
FALSE The document that must be completed signed and
submitted to the state to obtain authorization to
discharge is the NOT. (T/F)
All construction has been completed NOT can be filed when
both inside and outside
is in charge of daily activities Operations on a construction site are the entity in
charge of plans and specification and the entity
who?
Stay out of trouble with the law Motives for staying in compliance with storm water
objectives?
To protect and preserve beneficial Objectives of the clean water act are
use of U.S. waters, maintaining their
clean, physical and biological
integrity
National Pollutant Discharge NPDES stands for
Elimination System
Site description and maps, Which are a component of a good SWPPP
inspection and maintenance
procedure. Potential pollutant
sources, schedules of activities, site
contact information, plan
certification documents, site contact
info and descriptions of controls
BMP
False Construction sediment is not considered a
potential pollutant source (T/F)