GUIDEWIRE CLAIMCENTER PROFESSIONAL
EXAM 2026 ACTUAL SCRIPT WITH
ACCURATE ANSWERS GRADED A+
◉What is the purpose of integration? Answer: Integration allows
two systems to exchange data or perform work.
◉Why is it important for non-developers to have a basic
understanding of integration? Answer: Non-developers assist with
documenting requirements including data mapping between the
two systems and UI changes and communicate the requirements to
developers.
◉Name some common examples of InsuranceSuite integrations.
Answer: User authentication
Geocoding
Check printing
Document production
Document management
Address verification
, ◉What tasks are commonly performed by non-developers for
integrations? Answer: Non-developers often prepare data mapping
documents and screen mockups needed to support integration
development.
◉Which phases in the Guidewire project lifecycle are divided into
sprints? Answer: Inception
Development
Stabalization
◉What is the typical duration of a sprint in the Inception phase?
Answer: One week
◉During the Stabilization phase, what is the purpose of
performance testing? Answer: Run tests to check how well the
system works in anticipated and peak loads.
◉During the Deployment phase, what happens during the Pilot
step? Answer: - Allow a subset of users to use the system
- Gather feedback
- Triage feedback
- Implement changes as needed
EXAM 2026 ACTUAL SCRIPT WITH
ACCURATE ANSWERS GRADED A+
◉What is the purpose of integration? Answer: Integration allows
two systems to exchange data or perform work.
◉Why is it important for non-developers to have a basic
understanding of integration? Answer: Non-developers assist with
documenting requirements including data mapping between the
two systems and UI changes and communicate the requirements to
developers.
◉Name some common examples of InsuranceSuite integrations.
Answer: User authentication
Geocoding
Check printing
Document production
Document management
Address verification
, ◉What tasks are commonly performed by non-developers for
integrations? Answer: Non-developers often prepare data mapping
documents and screen mockups needed to support integration
development.
◉Which phases in the Guidewire project lifecycle are divided into
sprints? Answer: Inception
Development
Stabalization
◉What is the typical duration of a sprint in the Inception phase?
Answer: One week
◉During the Stabilization phase, what is the purpose of
performance testing? Answer: Run tests to check how well the
system works in anticipated and peak loads.
◉During the Deployment phase, what happens during the Pilot
step? Answer: - Allow a subset of users to use the system
- Gather feedback
- Triage feedback
- Implement changes as needed