OD BOLC Exam 3 with all Correct & 100% Verified
Answers |Latest Version |Already Graded A+
1. Large scale
are extensive
com-bat
joint combat operations in terms of scope and size of forces committed,
operations
conducted as a campaign aimed at
achieving operational and strategic objectives (ADP 3-0).
2. Phase I/ Phase II deployment planning, pre deployment activities
3. Phase III movement (port to port/fort to fort)
4. Phase IV Reception, staging, onward movement, integration (fort to foxhole)
5. Pre- -analyze the mission
deployment -structure forces
planning
-refine deployment data
-prepare the force
-schedule movement
Force projection (5
6. mobilization,
de-ployment, things)
em-ployment,
sus-tainment,
rede-ployment
7. Reception,
Stag-ing,
Onward R.S.O.I
Movement,
Inte-gration
8. Army
mobiliza-tion -Directs RC units to
Plan mobilize, assemble, and
prepare to deploy.
, OD BOLC Exam 3 with all Correct & 100% Verified
Answers |Latest Version |Already Graded A+
-Provides directives to the
Army Reserve and Army
National Guard.
-Specifies HQDA, Deputy of
Statt, G-4 logistical and
distribution policy require-
, OD BOLC Exam 3 with all Correct & 100% Verified
Answers |Latest Version |Already Graded A+
ments.
-Outlines executing
responsibilities of Army
Materiel Command
(AMC).
9. Power -PPP
projection -Army installation and joint bases, capable of deploying one or more
Platform army brigades or larger formations in a accordance with combatant
command require-ments
army installations, joint bases, or federally activated state-operated installations
10. Mobilization designated to provide mobilization support for both current and
force contingency operations. MFGIs provide pre and post mobilization readiness
generation support, and deployment preparation in support of combatant command
installation requirements
-RLD
11. Ready to
-Date when unit must be prepared to depart origin (installation for AC;
load date
Mobiliza-tion Station (MFGI) for RC)
-ALD
12. Available to
-When the unit must be ready to load an aircraft or ship at the Port of
load date
Embarkation (POE)
13. Earliest -EAD
arrival date -Earliest date for which a unit, a resupply shipment, or replacement
personnel, can be accepted at Port of Debarkation (POD) during
deployment.
14. Latest
arrival date -LAD
-Latest date on which a unit, a resupply shipment, or replacement
personnel, can be accepted at Port of Debarkation
(POD) to support the concepts of operations.
, OD BOLC Exam 3 with all Correct & 100% Verified
Answers |Latest Version |Already Graded A+
Answers |Latest Version |Already Graded A+
1. Large scale
are extensive
com-bat
joint combat operations in terms of scope and size of forces committed,
operations
conducted as a campaign aimed at
achieving operational and strategic objectives (ADP 3-0).
2. Phase I/ Phase II deployment planning, pre deployment activities
3. Phase III movement (port to port/fort to fort)
4. Phase IV Reception, staging, onward movement, integration (fort to foxhole)
5. Pre- -analyze the mission
deployment -structure forces
planning
-refine deployment data
-prepare the force
-schedule movement
Force projection (5
6. mobilization,
de-ployment, things)
em-ployment,
sus-tainment,
rede-ployment
7. Reception,
Stag-ing,
Onward R.S.O.I
Movement,
Inte-gration
8. Army
mobiliza-tion -Directs RC units to
Plan mobilize, assemble, and
prepare to deploy.
, OD BOLC Exam 3 with all Correct & 100% Verified
Answers |Latest Version |Already Graded A+
-Provides directives to the
Army Reserve and Army
National Guard.
-Specifies HQDA, Deputy of
Statt, G-4 logistical and
distribution policy require-
, OD BOLC Exam 3 with all Correct & 100% Verified
Answers |Latest Version |Already Graded A+
ments.
-Outlines executing
responsibilities of Army
Materiel Command
(AMC).
9. Power -PPP
projection -Army installation and joint bases, capable of deploying one or more
Platform army brigades or larger formations in a accordance with combatant
command require-ments
army installations, joint bases, or federally activated state-operated installations
10. Mobilization designated to provide mobilization support for both current and
force contingency operations. MFGIs provide pre and post mobilization readiness
generation support, and deployment preparation in support of combatant command
installation requirements
-RLD
11. Ready to
-Date when unit must be prepared to depart origin (installation for AC;
load date
Mobiliza-tion Station (MFGI) for RC)
-ALD
12. Available to
-When the unit must be ready to load an aircraft or ship at the Port of
load date
Embarkation (POE)
13. Earliest -EAD
arrival date -Earliest date for which a unit, a resupply shipment, or replacement
personnel, can be accepted at Port of Debarkation (POD) during
deployment.
14. Latest
arrival date -LAD
-Latest date on which a unit, a resupply shipment, or replacement
personnel, can be accepted at Port of Debarkation
(POD) to support the concepts of operations.
, OD BOLC Exam 3 with all Correct & 100% Verified
Answers |Latest Version |Already Graded A+