Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 51 pages
Exam (elaborations)

NCCCO Digger Derrick Operator Practice Exam Questions With Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf

Document preview thumbnail
Preview 4 out of 51 pages

NCCCO Digger Derrick Operator Practice Exam Questions With Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf

Content preview

NCCCO Digger Derrick Operator Practice Exam
Questions With Correct Answers (Verified
Answers) Plus Rationales 2026 Q&A | Instant
Download Pdf


1. What is the primary purpose of a digger derrick?
A. To lift and move personnel
B. To dig holes and set poles
C. To transport construction materials
D. To excavate trenches

B. To dig holes and set poles
Rationale: The digger derrick is specifically designed for augering
holes and setting utility poles efficiently, combining lifting and digging
capabilities.



2. Which OSHA regulation primarily governs the operation of digger
derricks?
A. 1910 Subpart N
B. 1926 Subpart CC

, C. 1910 Subpart O
D. 1926 Subpart P

B. 1926 Subpart CC
Rationale: OSHA’s Subpart CC addresses cranes and derricks in
construction, which includes digger derricks, outlining safety
requirements for their operation.



3. Before starting a digger derrick, the operator should:
A. Check the weather forecast
B. Conduct a pre-operation inspection
C. Notify the job supervisor only
D. Start the engine immediately

B. Conduct a pre-operation inspection
Rationale: A thorough pre-operation inspection is crucial to ensure
mechanical safety, stability, and proper functioning before any
operation begins.



4. When lifting a load with a digger derrick, the operator should:
A. Keep the boom fully extended at all times
B. Use rated capacity charts to determine safe limits

, C. Ignore the manufacturer’s load chart if experienced
D. Lift loads faster to increase efficiency

B. Use rated capacity charts to determine safe limits
Rationale: Operators must consult the digger derrick’s load chart to
ensure the lifted load does not exceed the machine’s rated capacity for
the given boom angle and extension.



5. What is the function of outriggers on a digger derrick?
A. Increase speed
B. Provide stability
C. Improve digging depth
D. Protect the hydraulic system

B. Provide stability
Rationale: Outriggers stabilize the digger derrick, preventing tipping
when lifting loads or augering holes.



6. When positioning a digger derrick for pole setting, the operator
should:
A. Always park on a slope for leverage
B. Avoid checking for underground utilities

, C. Ensure the base is level and stable
D. Keep the outriggers retracted

C. Ensure the base is level and stable
Rationale: A level and stable base is essential for safe operation;
uneven ground increases the risk of tip-over.



7. Which type of soil requires the most caution when augering
holes?
A. Sandy soil
B. Clay soil
C. Rocky soil
D. Peat soil

C. Rocky soil
Rationale: Rocky soil can resist auger penetration, increase torque on
the equipment, and cause mechanical failure or sudden movement,
requiring extra caution.



8. What should the operator do if the digger derrick begins to tip?
A. Accelerate lifting to counteract
B. Immediately lower the load and stop operations

Document information

Uploaded on
April 3, 2026
Number of pages
51
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$26.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Chiriz
4.0
(3)
Sold
17
Followers
5
Items
3650
Last sold
6 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions